My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 22 - Public Hearing Regarding Bristol Project
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
09/17/2024
>
Item 22 - Public Hearing Regarding Bristol Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2024 10:27:39 AM
Creation date
9/11/2024 11:16:48 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
22
Date
9/17/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1132
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Related Bristol Specific Plan Project <br />Mitigation Monitoring and Reporting Program <br />Responsible for <br />Standard Condition/ Plan, Program, Policy / Mitigation Measure/ <br />Ensuring Compliance / <br />Date Completed and <br />Condition of Approval <br />Timing <br />Verification <br />Initials <br />• The Project shall provide facilities to support electric charging stations <br />per the Tier 2 standards in Section A5.106.5.3 (Nonresidential <br />Voluntary Measures) and Section A5.106.8.2 (Residential Voluntary <br />Measures) of the 2022 CALGreen Code. <br />The Applicant shall coordinate with the City of Santa Ana and Orange County <br />Transit Authority to ensure that bus pad and shelter improvements are <br />incorporated, as appropriate. <br />City of Santa Ana Building <br />Mitigation Measure GHG-3: Landfill Waste. The development (Phase 1, <br />During construction <br />Phase 2, and Phase 3) shall divert a minimum of 75 percent of landfill waste. <br />Safety Division <br />Prior to issuance of certificate of occupancy, a recyclables collection and load <br />Prior to issuance of <br />area shall be constructed in compliance with the City standards for Recyclable <br />certificates of occupancy. <br />Collection and Loading Areas. <br />City of Santa Ana Building <br />Mitigation Measure GHG-4: Electrical Landscape Equipment. Prior to the <br />Prior to issuance of <br />issuance of Phase 1, Phase 2, or Phase 3 occupancy permits, the City Planning <br />certificates of occupancy. <br />Safety Division <br />and Building and Safety Divisions shall confirm that tenant lease agreements <br />include contractual language that all landscaping equipment used on site shall <br />be 100 percent electrically powered. This requirement shall be included in <br />the third -party vendor agreements for landscape services for the building <br />owner and tenants, as applicable. <br />Mitigation Measure GHG-5: Energy Efficient Appliances. All major <br />Prior to issuance of <br />City of Santa Ana Building <br />applicant provided in -unit residential appliances (e.g., dishwashers, <br />certificates of occupancy. <br />Safety Division <br />refrigerators, clothes washers and dryers, water heaters, and for space <br />heating) provided/installed shall be electric (i.e., appliances that do not use <br />natural gas, propane, or other fossil fuels) and Energy Star certified or of <br />equivalent energy efficiency where applicable. Prior to the issuance of the <br />certificate of occupancy, the City of Santa Ana shall verify implementation of <br />this requirement. Installation of electric Energy Star —certified or equivalent <br />appliances shall be verified by the Building Safety Division during plan check. <br />City of Santa Ana 18 <br />Final Supplemental EIR <br />August 2024 <br />
The URL can be used to link to this page
Your browser does not support the video tag.