Laserfiche WebLink
Related Bristol Specific Plan Project <br />4. Mitigation Monitoring and Reporting Program <br />Responsible for <br />Standard Condition/ Plan, Program, Policy / Mitigation Measure/ <br />Ensuring Compliance / <br />Date Completed and <br />Condition of Approval <br />Timing <br />Verification <br />Initials <br />The 2022 version of Title 24 (effective January 1, 2023, prior to the <br />July 2024 Supplement) is the baseline for improvement. <br />• The Project shall provide facilities to support electric charging <br />stations per the Tier 2 standards in Section A5.106.5.3 <br />(Nonresidential Voluntary Measures) and Section A5.106.8.2 <br />(Residential Voluntary Measures) of the 2022 CALGreen Code. The <br />2022 version of Title 24 (effective January 1, 2023, prior to the <br />July 2024 Supplement) is the baseline for improvement. <br />• The Applicant shall coordinate with the City of Santa Ana and <br />Orange County Transit Authority to ensure that bus pad and shelter <br />improvements are incorporated, as appropriate. <br />Mitigation Measure GHG-3: Landfill Waste. The development (Phase 1, <br />During construction <br />City of Santa Ana Building <br />Phase 2, and Phase 3) shall divert a minimum of 75 percent of landfill waste. <br />Safety Division <br />Prior to issuance of certificate of occupancy, a recyclables collection and load <br />Prior to issuance of <br />area shall be constructed in compliance with the City standards for Recyclable <br />certificates of occupancy. <br />Collection and Loading Areas. <br />Mitigation Measure GHG-4: Electrical Landscape Equipment. Prior to the <br />Prior to issuance of <br />City of Santa Ana Building <br />issuance of Phase 1, Phase 2, or Phase 3 occupancy permits, the City Planning <br />certificates of occupancy. <br />Safety Division <br />and Building and Safety Divisions shall confirm that tenant lease agreements <br />include contractual language that all landscaping equipment used on site shall <br />be 100 percent electrically powered. This requirement shall be included in <br />the third -party vendor agreements for landscape services for the building <br />owner and tenants, as applicable. <br />Mitigation Measure GHG-5: Energy Efficient Appliances. All major <br />Prior to issuance of <br />City of Santa Ana Building <br />applicant provided in -unit residential appliances (e.g., dishwashers, <br />certificates of occupancy. <br />Safety Division <br />refrigerators, clothes washers and dryers, water heaters, and for space <br />heating) provided/installed shall be electric (i.e., appliances that do not use <br />natural gas, propane, or other fossil fuels) and Energy Star certified or of <br />equivalent energy efficiency where applicable. Prior to the issuance of the <br />certificate of occupancy, the City of Santa Ana shall verify implementation of <br />this requirement. Installation of electric Energy Star —certified or equivalent <br />appliances shall be verified by the Building Safety Division during plan check. <br />City of Santa Ana 4-18 <br />Final Supplemental EIR <br />September 2024 <br />