My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 22 - Public Hearing Regarding Bristol Project
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
09/17/2024
>
Item 22 - Public Hearing Regarding Bristol Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2024 10:27:39 AM
Creation date
9/11/2024 11:16:48 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
22
Date
9/17/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1132
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Related Bristol Mixed -Use Project CEQA Findings of Fact <br />Plans, Program and Policies: <br />PPP WO-1: NPDES/SWPPP. As listed previously. <br />PPP WO-3: WQMP. As listed previously. <br />Impact Finding: The Project would not substantially alter the existing drainage pattern of the site <br />or area, including through the alteration of the course of a stream or river or through the addition <br />of impervious surfaces, in a manner which would substantially increase the rate or amount of surface <br />runoff in a manner which would result in flooding on- or offsite (Draft Supplemental EIR at p. 5.7- <br />15). <br />Facts in Support of Findings: <br />Construction <br />Implementation of the Project requires a SWPPP (included as PPP WQ-1) that would address site <br />specific drainage issues related to construction of the Project and include BMPs to eliminate the <br />potential of flooding or alteration of a drainage pattern during construction activities. This includes <br />regular monitoring and visual inspections during construction activities. Compliance with the <br />Construction General Permit and a SWPPP prepared by a QSD and implemented by a QSP (per <br />PPP WQ-1) as verified by the City through the construction permitting process would prevent <br />construction -related impacts related to potential alteration of a drainage pattern or flooding on or <br />offsite from development activities. Therefore, impacts would be less than significant (Draft <br />Supplemental EIR at p. 5.7-15). <br />Operation <br />As described previously and detailed in Table 5.7-2 of the Draft Supplemental EIR, the proposed <br />Project would result in a decrease of the 2-year, 24-hour storm runoff flowrate by 6.3 percent and <br />the proposed Project would manage runoff with vegetated biotreatment systems that have been <br />designed to accommodate the proposed Project design pursuant to the MS4 Permit and DAMP <br />requirements. The units would filter, treat, and discharge runoff into the existing and upsized offsite <br />storm drains. <br />As part of the permitting approval process, the proposed drainage design and engineering plans <br />would be reviewed by the City's Engineering Division to ensure that the proposed drainage would <br />accommodate the appropriate design flows. Additionally, the City permitting process would ensure <br />that the drainage system specifications adhere to the existing MS4 Permit and DAMP regulations, <br />which would ensure that pollutants are removed prior to discharge. Overall, with compliance to the <br />existing regulations as verified by the City's permitting process, Project impacts related to the <br />capacity of the drainage system and polluted runoff would be less than significant (Draft <br />Supplemental EIR at pp. 5.7-15 through 5.7-16). <br />Plans, Program and Policies: <br />PPP WO-1: NPDES/SWPPP. As listed previously. <br />City of Santa Ana 24 <br />CEQA Findings of Fact <br />September 2024 <br />
The URL can be used to link to this page
Your browser does not support the video tag.