My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 22 - Public Hearing Regarding Bristol Project
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
09/17/2024
>
Item 22 - Public Hearing Regarding Bristol Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2024 10:27:39 AM
Creation date
9/11/2024 11:16:48 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
22
Date
9/17/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1132
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Related Bristol Mixed -Use Project <br />CEQA Findings of Fact <br />As the Frank Bowerman Sanitary Landfill is permitted to accept 11,500 tons per day of solid waste, <br />and in March 2023, the maximum tonnage received was 8,909 tons, the facility had additional <br />capacity of 2,591 tons (Calrecycle 2023). Therefore, the Frank Bowerman Sanitary Landfill would <br />be able to accommodate the addition of 148.34 tons of waste per week. Thus, the proposed Project <br />would be served by a landfill with sufficient permitted capacity to accommodate the Project's solid <br />waste disposal needs and the Project would not impair the attainment of solid waste reduction <br />goals. Impacts related to landfill capacity would be less than significant (Draft Supplemental EIR at <br />pp. 5.15-23 through 5.15-24). <br />City of Santa Ana 44 <br />CEQA Findings of Fact <br />September 2024 <br />
The URL can be used to link to this page
Your browser does not support the video tag.