My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Presentation - #22
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
09/17/2024
>
Presentation - #22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/3/2024 4:02:59 PM
Creation date
9/17/2024 7:00:25 PM
Metadata
Fields
Template:
City Clerk
Agency
Planning & Building
Item #
22
Date
9/17/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Slide 78 Related Bristol Specific Plan <br />Item No. 22 <br />Planning and Building Agency <br />September 17, 2024 <br />Infrastructure Improvements <br />•In order to support the development intensity contemplated by the <br />General Plan Update and the South Bristol Street Focus Area, as well <br />as the proposed Specific Plan, numerous infrastructure improvements <br />are contemplated in the project area <br />•A Right-of-way maintenance agreement will be required so owner <br />maintains new public improvements, and will address weed <br />abatement, graffiti removal and vandalism, specialty pavement, and <br />specialty lighting. <br />–Owner may elect to, but is not obligated to, install specialty lighting above <br />and beyond standard street lights along the Project’s frontage on Bristol <br />Street, Sunflower Avenue, MacArthur Boulevard and Plaza Drive. <br />•Improvements are being integrated into new Public Realms Plan, a <br />separate long-range planning document underway as a <br />complementary effort to the Zoning Code Update
The URL can be used to link to this page
Your browser does not support the video tag.