Laserfiche WebLink
3. ACCEPTANCE TEST PLAN <br />The following section details the Motorola provided acceptance test procedure (ATP) <br />to confirm that the system, as provided by Motorola, is complete and meets the <br />contractually agreed upon acceptance test criteria. <br />3.1 COMMUNICATION LINK VERIFICATION ATP <br />The objective of this test is to verify the integrity and functionality of the Motorola <br />supplied equipment as well as the existing City of Santa Ana Police Department <br />(SAPD) portion of the system, including the communications links between the RNC <br />and field device via the SAPD base station. The test exercises the host link between a <br />Motorola provided pseudo host, the RNC 3000, base station modem link, base station, <br />and RF link to a field device and back again. The field device will consist of a <br />Motorola supplied VRM600 and laptop computer running the Motorola TX <br />application. A baseline test will first be performed using SAPD's NCP 500 to ensure <br />that no anomalies related to the existing system are introduced into the test. This <br />baseline test will follow the same procedure as detailed below with the obvious <br />substitutions of the NCP 500 and asynchronous port connections. <br />The up -link and down -link paths in the system from the RNC location, through the RF <br />base station to a field device and back again, will be tested. The pseudo host at the <br />RNC location is used to generate outbound messages to and receive inbound messages <br />from the field device. The field device operator will manually generate all inbound <br />messages. <br />The test team will consist of at least one authorized SAPD representative and at least <br />one Motorola employee. <br />3.1.1 Motorola Responsibilities <br />Motorola will assume responsibility for all the pretest set-up and will provide all <br />equipment required other than the SAPD infrastructure. Motorola will record all test <br />results and will have a minimum of one person available on -site to perform the tests. <br />3.1.2 Santa Ana Police Department Responsibilities <br />SAPD will be required to take the system off-line for a short period of time, usually <br />about four hours. During this time SAPD must ensure that all parts of the link under <br />test are free of voice or data traffic. An authorized system administrator from SAPD <br />roust be present prior to taking the current system off-line and during the testing. <br />Confidential and Proprietary 3 :• <br />