My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2024-10-01
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
10/01/2024
>
Agenda Packet_2024-10-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2024 9:03:36 AM
Creation date
9/25/2024 8:38:58 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
10/1/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2454
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> Evergreen Solutions, LLC Page 14 <br />2.2 Identify the strengths and weaknesses of the current pay plan(s) for the City. <br />2.3 Identify any pay compression issues and discuss solutions. <br />2.4 Complete an assessment of current conditions that details the nature of the current system, taking into <br />consideration compensation and benefits, as well as highlights areas for potential improvement in the <br />final adopted solution. <br />KEY PROJECT MILESTONES: Review of existing compensation plan(s); and assessment of current <br />conditions <br />Task 3.0: Collect and Review Current Environment Data <br />TASK GOALS: Conduct statistical and anecdotal research into the current environment within the City; and <br />guide subsequent analytical tasks. <br />TASK ACTIVITIES <br />3.1 Schedule and conduct employee orientation sessions to describe the scope of work and methodology. <br />3.2 Interview department heads to obtain relevant information and statistical data on specific compensation <br /> issues and policies. Obtain insight into perceived current compensation system strengths and <br /> weaknesses. <br />3.3 Hold focus groups with a sample of employees to obtain additional relevant information and statistical <br /> data on specific compensation issues and policies. <br />3.4 Work with the CPM and Human Resources staff to administer the JATs and MITs. Our staff utilizes a <br /> web-based tool for data collection, but we can provide paper copies as well as those for classifications <br /> without computers or Internet access. We will seek approval from the CPM before distribution of the <br /> JAT/MIT questionnaire. <br />3.5 Review any data provided by the City that may provide additional relevant insight. <br />Note: Evergreen will provide two staff persons over the course of three days to conduct all outreach in <br />this task. <br />KEY PROJECT MILESTONES: Department head interviews; employee focus groups and orientation <br />sessions; and JAT/MIT distribution <br />Task 4.0: Evaluate and Build Projected Classification Plan and Make FLSA Determinations <br />TASK GOALS: Identify the classification of existing positions utilizing the approved method for job <br />evaluation; and characterize internal equity relationships within the City. <br />TASK ACTIVITIES <br />4.1 Ensure that all draft class specifications are provided to Evergreen by the CPM. <br />4.2 Review the work performed by each classification and score based on job evaluation. Include an <br /> evaluation of supervisory comments. <br /> <br /> <br />City Council 12 – 16 10/1/2024
The URL can be used to link to this page
Your browser does not support the video tag.