Laserfiche WebLink
Related Bristol Specific Plan Project <br />Mitigation Monitoring and Reporting Program <br />Standard Condition/ Plan, Program, Policy / Mitigation Measure/ <br />Condition of Approval <br />Timing <br />Responsible for <br />Ensuring Compliance / <br />Verification <br />Date Completed and <br />Initials <br />requires MERV 13 filters to be installed prior to occupancy and replaced <br />and/or maintained as directed by the manufacturer. <br />GPU FOR Mitigation Measure AQ-1: Prior to discretionary approval by the <br />Prior to discretionary <br />City of Santa Ana Building <br />City of Santa Ana for development projects subject to CEQA (California <br />approval <br />Safety Division <br />Environmental Quality Act) review (i.e., non-exempt projects), project <br />applicants shall prepare and submit a technical assessment evaluating <br />potential project construction -related air quality impacts to the City of Santa <br />Ana for review and approval. The evaluation shall be prepared in <br />conformance with South Coast Air Quality Management District (South Coast <br />AQMD) methodology for assessing air quality impacts. If construction -related <br />criteria air pollutants are determined to have the potential to exceed the <br />South Coast AQMD's adopted thresholds of significance, the City of Santa <br />Ana shall require that applicants for new development projects incorporate <br />mitigation measures to reduce air pollutant emissions during construction <br />activities. These identified measures shall be incorporated into all <br />appropriate construction documents (e.g., construction management plans) <br />submitted to the City and shall be verified by the City. Mitigation measures to <br />reduce construction -related emissions could include, but are not limited to: <br />• Require fugitive -dust control measures that exceed South Coast <br />AQMD's Rule 403, such as: <br />o Use of nontoxic soil stabilizers to reduce wind erosion. <br />o Apply water every four hours to active soil -disturbing activities. <br />o Tarp and/or maintain a minimum of 24 inches of freeboard on <br />trucks hauling dirt, sand, soil, or other loose materials. <br />• Use construction equipment rated by the United States Environmental <br />Protection Agency as having Tier 3 (model year 2006 or newer) or <br />Tier 4 (model year 2008 or newer) emission limits, applicable for <br />engines between 50 and 750 horsepower. <br />• Ensure that construction equipment is properly serviced and maintained <br />to the manufacturer's standards. <br />City of Santa Ana <br />Final Supplemental EIR <br />August 2024 <br />