Laserfiche WebLink
Exhibit A to Exhibit 6 — Conditions of Approval for VTTM No. 2023-01 <br />video detection camera system for entire intersection. Install APS for entire <br />intersection. Install new CCTV camera per City specifications and any <br />associated appurtenances as conceptually illustrated in Exhibit C, attached. <br />d. MacArthur Boulevard at Plaza Drive. Modify existing traffic signal to <br />accommodate the intersection improvements. Remove and salvage <br />existing impacted traffic signal poles and replace with new traffic signal <br />poles to standard. Install new City approved controller and cabinet. Install <br />video detection camera system for entire intersection. Install APS for entire <br />intersection. Install new CCTV camera per City specifications and any <br />associated appurtenances as conceptually illustrated in Exhibit D, attached. <br />e. Plaza Drive at Callens Common. Install new traffic signal including traffic <br />signal poles, controller cabinet, meter pedestal, conduit, wiring, video <br />detection system, APS, CCTV camera per City specifications, emergency <br />vehicle preemption, signage, and fiber optic communication system to <br />connect to City of Santa Ana traffic signal network and any associated <br />appurtenances as conceptually illustrated in Exhibit E, attached. <br />f. Bristol Street at Existing Driveway. Install new traffic signal including traffic <br />signal poles, controller cabinet, meter pedestal, conduit, wiring, video <br />detection system, APS, CCTV camera per City specifications, emergency <br />vehicle preemption, signage, and fiber optic communication system to <br />connect to City of Santa Ana traffic signal network and any associated <br />appurtenances as conceptually illustrated in Exhibit F, attached. <br />g. Sunflower Avenue at Proposed Driveway. Install new traffic signal including <br />traffic signal poles, controller cabinet, meter pedestal, conduit, wiring, video <br />detection system, APS, CCTV camera per City specifications, emergency <br />vehicle preemption, signage, and fiber optic communication system to <br />connect to City of Santa Ana traffic signal network and any associated <br />appurtenances as conceptually illustrated in Exhibit G, attached. <br />14. Timing of Improvements and Project Phasing. The Development is proposed to be <br />constructed in 3 consecutive phases as shown on Figure 6-2 (Conceptual Phasing <br />Plan) of the Specific Plan. Construction and completion of all public improvements <br />described shall commence and be completed in a phased manner to correspond <br />to the phasing of the Project as follows: <br />a. Phase I — Southerly half of project (south of proposed Callens Common). <br />i. Prior to issuance of building permit for the first Implementing Project <br />on Phase 1, Owner shall: <br />1. Submit public improvement plans and a deposit/bond for all <br />public improvements on Sunflower Avenue, between Bristol <br />Street and western edge of the property, and Bristol Street <br />between Sunflower Avenue and Callens Common. <br />ii. Prior to issuance of final Certificate of Occupancy of 50% or more of <br />the residential units allowed for Phase 1, or any final Certificate of <br />Occupancy on Phase 11 or III, Owner shall: <br />Page 4 of 10 <br />1 <br />