My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 26 - Public Hearing Regarding Bristol Project
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
10/01/2024
>
Item 26 - Public Hearing Regarding Bristol Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2024 12:33:51 PM
Creation date
9/25/2024 8:40:22 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
26
Date
10/1/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1144
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table B-1 <br />IMPLAN Inputs for Construction Phase Impacts <br />Project Bristol <br />IMPLAN Industry Sector <br />55 - Construction of new commercial structures <br />58 - Construction of new multifamily residential structures <br />Total <br />Construction Indutry Output Value by Phase <br />Phase 1 Phase 2 Phase 3 <br />$230,382,500 $35,327,500 $19,022,500 <br />752,710,000 380,064,000 674,436,000 <br />$983,092,500 $415,391,500 $693,458,500 <br />Note: Construction values include all hard and soft (architectural, engineering, legal, etc.) costs. They do not include other <br />common construction costs, such as land or furniture, fixtures, and equipment (FF&E). The estimated allocation between <br />industry sectors is based on the relative distribution of project residential and commercial construction costs. <br />Source: IMPLAN; Applicant; TNDG. <br />Exhibit 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.