My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 26 - Public Hearing Regarding Bristol Project
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
10/01/2024
>
Item 26 - Public Hearing Regarding Bristol Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2024 12:33:51 PM
Creation date
9/25/2024 8:40:22 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
26
Date
10/1/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1144
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ta <br />www.FinanceDTA.com <br />X CONCLUSION <br />SECTION X <br />CONCLUSION <br />DTA reviewed the Specific Plan to understand the proposed Project. We obtained market <br />information from CoStar for multifamily, retail, hotel, and congregate care products for both <br />Orange County and a 2-Mile Zone surrounding the Project site. We also reviewed the City's <br />website for development regulations and standard plans for construction projects. DTA <br />assessed DIFs currently being imposed by the City from various government websites. <br />DTA referred to its database for development costs and reviewed similar projects to budget <br />the indirect costs, marketing costs, and financing costs that are discussed above. We <br />prepared a Project cash flow in accordance with the Project timing described in the Specific <br />Plan. <br />Often, large-scale development projects are amended as more information is analyzed. <br />Product mixes may change after the completion of detailed market studies that may identify <br />alternative product mixes and product types that may yield better financial metrics. DTA <br />assumed that the final land plan and individual buildings may be modified to address the <br />evolving marketplace during the life of the Project, which the Specific Plan identities will be <br />completed in 2035. <br />In preparing our Report, DTA evaluated the Specific Plan and determined that the Project <br />would be financially successful based upon the available information, although we <br />acknowledge Project metrics may change as more information becomes available. Based <br />upon the information reviewed, DTA determined that the proposed Project would be <br />profitable since the Project's NAV is $597,895,000, as shown in Table 49 below. <br />Table 49: NAV Summary <br />Total NAV <br />$2,377,266,000 <br />Total Costs <br />($1,779,371,000) <br />Excess of NAV Over Costs <br />$597,895,000 <br />Related Bristol at 3600 South Bristol Street <br />Land Residual Value Study Report <br />Exhibit 10 <br />September 27, 2023 <br />34 <br />
The URL can be used to link to this page
Your browser does not support the video tag.