My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 26 - Public Hearing Regarding Bristol Project
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
10/01/2024
>
Item 26 - Public Hearing Regarding Bristol Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2024 12:33:51 PM
Creation date
9/25/2024 8:40:22 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
26
Date
10/1/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1144
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION I <br />ta <br />www.FinanceDTA.com <br />PROJECT INFORMATION <br />PROJECT INFORMATION <br />DTA has been engaged to conduct a Market Study (the "Study") for the Related Bristol Specific Plan project <br />(the "Project") located in the City of Santa Ana (the "City"), California, on behalf of EPD Solutions, Inc. (the <br />"Client'). The Project has been proposed by RCR Bristol, LLC (the "Developer"). The specific purposed of <br />the Market Study Report (the "Report") is to provide the City with a better understanding of current real <br />estate market conditions, a forecast of anticipated future absorption of the Project (estimated to be 10 <br />years for the residential component), and an analysis of the financial opportunities inherent in the Related <br />Bristol Specific Plan ("Specific Plan"). <br />The Project site includes Income -Producing Properties <br />("IPP") expected to comprise 3,750 dwelling units, <br />350,000 square feet ("SF") of retail space, a 250-room <br />hotel, and a 200-bed congregate care facility, as well as <br />roadways, parks, and open space. The Project is also <br />planning to construct 3,690 parking spaces, the vast <br />majority of which will be underground. <br />The Specific Plan area is located north of Interstate 405 <br />(the San Diego Freeway) and west of State Route 55 (the <br />Orange Freeway). The adjacent streets are Sunflower <br />Avenue to the south, South Bristol Street to the east, <br />South Plaza Drive to the west, and West Sunflower to <br />the south, with the latter being the boundary between <br />Santa Ana and Costa Mesa. <br />The current use of the 41.0-acre site includes 465,000 <br />SF of obsolete retail space. The City had a vision for the redevelopment of this area, known as the South <br />Bristol Focus Area, and updated its General Plan to accommodate a different type of development <br />targeting the look and feel of an urban village. A primary goal of an urban village setting is that residents <br />desire that the community be walkable to both local -serving retail and recreational amenities. The <br />Developer responded to the City's desires by targeting a Project design that would both achieve the <br />desired urban feeling while creating an economically successful project. The adjacency to South Coast <br />Plaza and Segerstrom Center for the Arts provides a strong draw for people to both live and work in the <br />surrounding community. <br />The Project site is strategically located within: <br />■ 3 miles of the Irvine Business District, adjacent to John Wayne Airport (SNA); <br />■ 5 miles to downtown Santa Ana, the seat of Santa Ana and Orange County governments; <br />■ 6 miles to Fashion Island, a high-rise office and residential district in Newport Beach; and <br />■ 12 miles to the Irvine Spectrum Center, a high-rise office and residential district at the intersection <br />of the 1-5 and 1-405 freeways. <br />Related Bristol at 3600 South Bristol Street September 2023 <br />Draft Market Study Report <br />Exhibit 10 <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.