Laserfiche WebLink
Exhibit A to Exhibit 5 - Conditions of Approval for VTTM No. 2023-01 <br />iii. Timing of Payment: Payment to be made to the City upon issuance <br />of building permits for first development project for southerly Phase <br />(Phase 1) of the Project. <br />b. Intersection of Fairview Street at Segerstrom Avenue <br />i. Restripe to provide an exclusive WB right turn lane and eliminate the <br />existing street parking. <br />ii. Owner Proportionate Share: 2.51 %. <br />iii. Timing of Payment: Payment to be made to the City upon issuance <br />of building permits for first development project for northerly Phase <br />(Phase II) of the Project. <br />c. Intersection of Bristol Street at Segerstrom Avenue <br />i. Restripe to provide exclusive NB right turn lane <br />ii. Owner Proportionate Share: 6.70%. <br />iii. Timing of Payment: Payment to be made to the City upon issuance <br />of building permits for first development project for northerly Phase <br />(Phase II) of the Project. <br />d. Intersection of Main Street and MacArthur Boulevard <br />i. Owner Proportionate Share: 15.65%. <br />ii. Modify the traffic signal to provide NB and SB right -turn overlap <br />phasing. <br />iii. Timing of Payment: Payment to be made to the City upon issuance <br />of building permits for first development project for northerly Phase <br />(Phase II) of the Project. <br />e. SR-73 NB Off Ramp at Bear Street <br />i. Related Bristol Proportionate Share: 6.31 %. <br />ii. Scope: Restripe the NB off -ramp to convert the existing left -turn lane <br />to a shared left/right lane. <br />iii. Timing of Payment: Payment to be to the City prior to issuance of <br />building permits for the first development project in Phase III (last <br />phase) of the Project. <br />f. Flower Street at Segerstrom Avenue/Dyer Road <br />i. Related Bristol Proportionate Share: 4.10%. <br />ii. Scope: Modify traffic signal to add left -turn signal for the NB and SB <br />directions including new traffic signal poles, controller cabinet, <br />conduit, wiring, pedestrian & bike detection, signage, fiber optic <br />communication system. <br />iii. Timing of Payment: Payment to be to the City prior to issuance of <br />building permits for the first development project in Phase III (last <br />phase) of the Project. <br />16. Plans & Standards. All public improvements will require engineered plans to be <br />approved by the Public Works Agency and permits issued for such improvements. <br />Improvements will be in conformance with City standards, rules and regulations in <br />place at time of plan approvals. <br />17. Right of Way Maintenance Agreement. Owner shall enter into a Right of Way <br />Page 8 of 10 <br />