My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-053 - Final Supplemental for The Related Bristol Specific Plan Project
Clerk
>
Resolutions
>
CITY COUNCIL
>
2011 -
>
2024
>
2024-053 - Final Supplemental for The Related Bristol Specific Plan Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/9/2024 10:41:47 AM
Creation date
10/9/2024 10:31:30 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Agency
Planning & Building
Doc #
2024-053
Item #
26
Date
10/1/2024
Destruction Year
P
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
173
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION VIII <br />RESOLUTION REGARDING GROWTH -INDUCING IMPACTS AND COMMITMENT OF <br />RESOURCES <br />Draft Supplemental EIR Section 5.16, Mandatory Findings of Significance, evaluates the potential <br />for the proposed Project to affect economic or population growth, or the construction of additional <br />housing, either directly or indirectly, in the surrounding environment. <br />Employment Related Growth <br />As detailed in Draft Supplemental EIR Section 5.10, Population and Housing, the Project is <br />anticipated to generate approximately 1,092 employees at full occupancy, which would be <br />approximately 14 percent of the GPU projected increase in employment from buildout of the South <br />Bristol Street Focus Area. Therefore, employment growth from buildout of the proposed Project <br />would not exceed the growth identified in the GPU Final EIR, and impacts related to employment <br />growth would be less than significant (Draft Supplemental EIR, pp. 5.10-8 through 5.16-9) <br />Infrastructure Obstacles to Growth <br />The proposed Project would redevelop the existing onsite infrastructure systems and provide an <br />offsite sewer line improvement that would connect to the existing offsite systems that currently serve <br />the Project site. The new infrastructure would not provide additional capacity beyond what is <br />needed to serve the proposed Project. In addition, because the Project is within a developed area <br />that is receiving services from existing infrastructure and would connect to the existing infrastructure, <br />development of the proposed Project would not result in an expansion of overall capacity, extension <br />of infrastructure, or provision of services in areas or an unserved area. Therefore, infrastructure <br />improvements would not result in significant growth inducing impacts (Draft Supplemental EIR, pp. <br />5.10-10 through 5.16-1 1) <br />Land Development Regulation Obstacles to Growth <br />The proposed Project includes amendments to the zoning code to allow for the redevelopment of <br />the site to provide the proposed mixed -use development. The Project includes a proposed zoning <br />change from Regional Commercial (C-2) and General Commercial (CR) to the Related Bristol <br />Specific Plan District which would also provide specific development regulations for the mixed -use <br />Project. <br />The proposed Project is redevelopment of an already developed area that has been used for <br />urban uses since 1972 and is surrounded by urban development or areas planned for urban <br />development. The proposed Project would involve a change to development regulations and would <br />result in onsite residents and additional onsite employees. However, the zoning change is parcel <br />specific and would result in growth that is consistent with the General Plan. Thus, changes to the <br />Project site's zoning designation would not result in removing an obstacle to growth within the Project <br />vicinity. <br />
The URL can be used to link to this page
Your browser does not support the video tag.