Laserfiche WebLink
<br />Project Overview 2-3 October 2024 <br />10th and Flower Street Park Project 2020-089 <br /> <br />pathways and within the playgrounds/natural play areas for children. The proposed down-shield lighting <br />would be timer controlled and remain on through the evening and automatically shut off during the day. <br />2.3 Project Funding <br />2.3.1 Land and Water Conservation Fund <br />The Proposed Project will be partially funded by the Land and Water Conservation Fund (LWCF) grant <br />from the National Parks Service (NPS). This grant will cover the southern half of the park site including the <br />basketball court, skate park, fitness zone, playground, and picnic areas. <br />2.3.2 American Rescue Plan Act Funds <br />The Proposed Project will be partially funded by American Rescue Plan Act (ARPA) funds. These funds will <br />cover the northern half of the park site including the 10th Street cul-de-sac, picnic areas, and hybrid <br />crosswalk beacon. <br />2.4 Project Timing <br />The Project would be constructed in two phases. Project construction is anticipated to begin in Spring <br />2025 and occur through Spring 2026. Phase 1 would include closure of 10th Street and construction of the <br />cul-de-sac, crosswalk, and site preparation for the northern picnic area. Phase 2 would demolish the <br />existing single-family residences and construct the remaining park amenities including the basketball <br />court, skate park, playground, fitness area, picnic areas, turf, and bioswales. This phase also includes <br />construction of the underground bio-retention facilities. <br /> <br />  <br />  <br />City Council 12 – 46 10/15/2024