Final Initial Study and Mitigated Negative Declaration <br />Mitigation Monitoring and Reporting Plan 5-9 October 2024 10th and Flower Street Park Project 2023-145 <br />Table 5-1. 10th and Flower Street Park Project Mitigation Monitoring and Reporting Plan <br />Mitigation Measure Monitoring Activity/ Timing/ Frequency <br />Implementation Responsibility/ Verification <br />Responsibility for Oversight of Compliance/ Verification <br />Outside Agency Coordination Comments <br />the PRC). If no agreement is reached, <br />the landowner must rebury the <br />remains where they will not be further <br />disturbed (Section 5097.98 of the PRC). <br />This will also include either recording <br />the site with the NAHC or the <br />appropriate Information Center; using <br />an open space or conservation zoning <br />designation or easement; or recording <br />a reinternment document with the <br />county in which the property is located <br />(AB 2641). Work may not resume <br />within the no-work radius until the <br />lead agencies, through consultation as <br />appropriate, determine that the <br />treatment measures have been <br />completed to their satisfaction. <br />  <br />  <br />City Council 12 – 60 10/15/2024