My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
VIDO SAMARZICH, INC. (7)
Clerk
>
Contracts / Agreements
>
PROJECTS
>
VIDO SAMARZICH, INC. (7)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2024 4:52:32 PM
Creation date
10/15/2024 11:35:23 AM
Metadata
Fields
Template:
Contracts
Company Name
VIDO SAMARZICH, INC.
Contract #
P20-6965, 20-6962
Agency
Public Works
Council Approval Date
9/17/2024
Insurance Exp Date
12/23/2024
Notes
P23-6707, 23-6705, 19-6923
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />PROPOSAL <br />PROJF.CI NO. 2u-6965, ATP 5 W3(196) - STANDARD AVE BIKEWAY FROM WARNER AVE TO 2Nn SI <br />PROJEC'I NO. NI-6962, NIP 5063(UR) MCFADDEN AVE BIKEWAY FROM HARBOR BLVD TO GRAND AVE <br />PROJECT' NO 23-6707 - STANDARD AVE PAVEMENT REHABILITATION FROM WARNER AVE. TO 2ND ST <br />PROJEC'IT0.23-6705 MCI- ADDF.NAVE PAVEMENT" REHABILITATION PROM[ I[ARBOR BLVD TO FAIRVIEW S'r <br />PROJECT NO. 19-6923 MCFADDEN AVE PAVEMENT" RE ABILITATTON FROM FAIRVIEW Sf' To RANT Sr <br />PROJECT NO. 23-6706 NICFADDEN AVE PAVEMENT REHABILITATION FROM RAIIT SI TO GRAND AVE <br />I escription Qty knit III Amnnnt <br />1'4L ADD ALTERNATE NO.2 BID 4,091,740. <br />TOTAL BASE BID +ADD ALTERNATE NO. 1 I $ 19,170,059.50 <br />TOTAL BASE BID +ADD ALTERNATE NO. 2 1 S <br />The lowest responsible bidder shall be selected based on the total base bid. The City reserves the <br />right to award the Base Bid, and any, all, or none of the add -alternate bid items (if any). <br />* The quantity for this bid item is shown for bid comparison only. This bid item shall not be <br />subject to the "25%" limit as stated in Section 7-3.5 of the Standard Specifications. The actual <br />amount for this item will be dictated by the actual quantity used, and the Agency reserves the <br />right to increase or decrease the quantity of this item accordingly. <br />** Contractor shall coordinate with the City if additional days are required for the project. <br />f This bid item is considered a Specialty Item per Section 3-2 of the Standard Specifications. <br />TIME FOR COMPLETION OF IMPROVEMENTS AND LIQUIDATED DAMAGES <br />The undersigned bidder hereby proposes to complete the Work for the total base bid amount shown <br />above, within a project total maximum number of 350 workintt days total constnicticn, nhnse <br />in special provisions section 3.02 "Project Phasing and Lane Requirements" after the <br />commencement date stated in the Notice to Proceed. Upon issuance of the Notice to Proceed, <br />Contractor shall immediately place order for long -lead time items (i.e. traffic signal equipment). <br />The Contractor shall submit a construction schedule within ten (10) working days from the date of <br />award of contract, which shall include the lead-times for any item requiring long lead-times. The <br />liquidated damages amount, in lieu of the amount specified in Subsection 6-9 of the Standard <br />P-12 of P-29 <br />
The URL can be used to link to this page
Your browser does not support the video tag.