My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RAVENSWOOD STUDIO, INC.
Clerk
>
Contracts / Agreements
>
R
>
RAVENSWOOD STUDIO, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2024 10:46:14 AM
Creation date
10/29/2024 9:48:28 AM
Metadata
Fields
Template:
Contracts
Company Name
RAVENSWOOD STUDIO, INC.
Contract #
A-2024-175
Agency
Library
Council Approval Date
10/15/2024
Expiration Date
12/31/2026
Insurance Exp Date
6/25/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• One 2-part boat with the stern at 2'-3 7/16" wide x 4'-7 5/8" wide x 3'4' high with painted <br />plywood and curved structure as rendered. Includes sensory wall panels. Bow to be 3'-10 1/4" <br />wide x 4'-7 5/8" wide x 5'-1/2" high with CNCed figurehead, two wheels, halo with switches, levers <br />and buttons in natural plywood. Top mast to be brown and green painted with CNCed plywood <br />construction; <br />• Two CNCed and hand -painted graphics on 1/2" ply or Apple ply. <br />Note: Does not include engineering review. If final design requires engineering review this will <br />be handeled as a CO with costs based on the final design. <br />222,450.00 <br />• Ball run Interactive budget per design; <br />• Three hand -painted graphics on 1/2" ply or Apply ply; one large graphic applied to acrylic. <br />Note: Does not include engineering review. If final design requires engineering review this will <br />be handeled as a CO with costs based on the final design. <br />• Budget for buy-out HABA or similar wall panel interactives, <br />Dimensional Appliques $48,750.00 <br />• Thirty five graphics to be CNCed and hand painted on 1/2" ply or Apple ply and mounted to <br />exhibitry. <br />it rr <br />• Site survey to confirm existing conditions, <br />r Trucking $13,500.00 <br />• Dedicated trucking including return shipment for tools and equipment. <br />• Client will be charged actuals at no mark up. <br />21 Performance Bond lr rr <br />• Performance Bond per project requirements. <br />22 1 Project Assumptions • rr <br />• This proposal is based on project completion by the end of Q1 2026. See detailed project <br />schedule for specific completion date. Extending the project completion past this date may incur <br />labor or material escalation costs. <br />• The provided schedule is tentative and must be confirmed and aligned to the facility <br />construction schedule that currently has a March 10, 2026 completion date. This will allow for <br />Fabrication to complete in time for a coordinated installation when the facility is ready to <br />accept materials for installation. We are prepared to move the Project Completion date to align <br />with the facility construction schedule. <br />• In the event that, after Fabrication begins, there are delays in facility readiness that require <br />the exhibit materials to be stored for more than 1 month before installation, storage charges may <br />be billed to the project. <br />• This proposal includes a complete set of shop drawings for all fabricated elements and as-builts <br />if required by changes during fabrication. <br />• At the conclusion of installation, an Operations and Maintenance manual will be provided and <br />staff training as part of project closeout. <br />PROPOSALTOTAL:' ' $852,535.00 <br />6900 N. Ci,mo7l Part, Avenue.: Lincolnwood, 11 60712 1 P: (817-6714 2-d00 I F- (84',) - 679 .2805 311Sj?024 P4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.