Laserfiche WebLink
Exhibit D: Proposed Structure Improvements("Work Plan") <br /> 825 North Lacy Street <br /> Item Year Improvement <br /> 1 2024 Reroof main house and garage and repair eaves as needed, like-for-like <br /> 2 2024 Remove internal masonry fireplace and chimney due to structural safety concerns, <br /> and repair external wood chimney like-for-like <br /> 3 2024 Repair windows and exterior window framing on main house and garage, like-for- <br /> like <br /> 4 2024 Repair window screens throughout <br /> 5 2024 Repair termite damage as needed <br /> 6 2026 Repaint exterior <br /> 7 2027 Replace north side door with period-appropriate door and hardware <br /> 8 2028 Replace exterior lighting with period-appropriate lighting on main house and <br /> garage <br /> 9 2029 Replace plastic door screens with period-appropriate wood screens <br /> 10 2030 Replace gutters with compatible gutters (choosing appropriate color and material) <br /> 11 2031 Repair siding on main house and garage as needed, like-for-like <br /> 12 2032 Replace garage door with period-appropriate garage door <br />