Laserfiche WebLink
UNITCHUTE DISCHARGE ROOMCORR.STORAGECHUTEACCESS ROOMCORR.CHUTEACCESS ROOMCORR.CHUTEACCESS ROOMCORR.CHUTEACCESS ROOMCORR.CHUTEACCESS ROOMCORR.CHUTEACCESS ROOMCORR.CHUTEACCESS ROOMCLUBROOMUNITUNITUNITUNITUNITUNITUNITUNITUNITTRASH ROOMENTRYCORR.11'-9 1/8"10'-1"8'-11 1/2"9'-1"9'-1"9'-1"1ST FL T.O. SLAB AT RESTAURANTT.O.PL3RD FL (PODIUM LEVEL) T.O. SLAB4TH FL SUBFLOOR5TH FL SUBFLOOR6TH FL SUBFLOORT.O.PLT.O.PLT.O.PL2ND FL T.O. SLAB122.66' FF134.42' FF144.50' FF9'-1"7TH FL SUBFLOORT.O.PL134589119AD-211-HR ROOF/CLG3AD-211-HR FLR/CLG1-HR FIRE BARRIERPER 713.13.31AD-229AD-211-HR ROOF/CLG1AD-211-HR FLR/CLG15AD-232-HR FIRE BARRIER15AD-232-HR FIRE BARRIER1272TYP.TYP.15AD-232-HR FIRE BARRIERCCOPYRIGHTIt is the clients responsibility prior to or during construction to notify the architect in writingof any perceived errors or omissions in the plans and specifications of which a contractorthoroughly knowledgeable with the building codes and methods of construction shouldreasonably be aware. Written instructions addressing such perceived errors or omissionsshall be received from the architect prior to the client or clients subcontractors proceedingwith the work. The client will be responsible for any defects in construction if theseprocedures are not followed.Architecture + Planning17911 Von Karman Ave.Suite 200Irvine, CA 92614ktgy.com949.851.2133License StampProject Contact:Email:Principal: Project Designer:Project Director:KTGY Project No:2017-0934Debbie Hollanddholland@ktgy.comWil WongD. SchoolmeesterDebbie HollandDeveloperPHONE NO.4199 CAMPUS DRIVEIRVINE, CA 92612(714) 342-2502415 & 515 E. 4TH STREET, SANTA ANA, CA 92701 <br />4TH AND MORTIMERNo.Date Description06-21-2023 FIFTH BUILDING DEPARTMENT SUBMITTALA03-21-23ADDENDUM ABUILDING A TRASHCHUTE SECTIONSA5-95TRASH ROOM KEYNOTESTRASH ROOM NOTES1.FACE OF FINISH SHALL BE FLUSH INSIDE OF SHAFT2.ALL DIMENSIONS ARE TO THE FACE OF STUD, CMU OR CONCRETE, U.N.O.3.TRASH TERMINATION ROOM FLOORS SHALL BE FINISHED WITH WATERPROOF DECK OR EPOXYCOATING.4.WALLS SHALL BE FINISHED WITH WASHABLE WATERPROOF SURFACE SUCH AS FRP OR HIGH-GLOSSENAMEL PAINT TO 6'-0" AFF.5.ODOR CONTROL UNIT MOUNTED ON WALL OF THE TRASH TERMINATION ROOM.6.DISINFECTING AND SANITIZING UNIT AT THE TOP OF THE CHUTE.7.VERIFY ALL ACCESSORIES FOR TRASH TERMINATION ROOM WITH OWNER AND CONFIRM POWERREQUIREMENTS WITH ELECTRICAL ENGINEER.TRASH CHUTE DOOR ACCESSIBILITY NOTES:1.MAXIMUM 5 POUNDS OPENING FORCE2.DOOR HARDWARE SHALL NOT REQUIRE GRASPING PINCHING, TWISTING OF WRIST3.DOOR HARDWARE CONTROLS SHALL BE 15"-48" ABOVE FINISH FLOOR TO THE HIGHEST OPERATINGMECHANISMTRASH CHUTE ACCESS ROOM ACOUSTICAL NOTES:4.DOORS TO THE TRASH CHUTE ROOM SHOULD HAVE ADJUSTABLE CLOSER THAT CAN BE ADJUSTED SOTHE DOOR DOES NOT SLAM.5.DOOR TO THE TRASH CHUTE SHALL EMPLOY QUIET LATCHING.6.PROVIDE SOUNDCOAT GP-1 COMPOUND OR EQUAL ON THE CHUTE. DAMPENING SHALL BE MIN 12 THETHICKNESS OF THE STEEL.7.PROVIDE VIBRATION ISOLATION OF THE CHUTE WHERE CONNECTED TO THE APARTMENT BUIDLINGEQUAL TO MASON INDUSTRIES TYPE BR HAVING 0.2 INCHES OF STATIC ISOLATION.30" x48" CLEAR FLOOR AREA5'-0" DIAMETER TURN AROUND SPACELEGENDRUBBISH CHUTES - (3) 30" DIA, 16 GAUGE ALUMINIZED STEEL W/ DAMPING COMPOUNDON THE CHUTE EQUAL TO SOUNDCOAT GP-1 SHOULD BE INCORPORATED AS PART OFTHE BID REQUIREMENT. DAMPING SHOULD BE 1/2" THICKNESS OF STEEL. PROVIDESPRINKLERS AT TOP INTAKE AND EVERY 2ND OPENING - PROVIDE FLUSHING SPRAYHEAD AND A DISINFECTING AND SANITIZING UNITINTAKE DOOR - 15"x18" STAINLESS STEEL FRONT BACK AND SKIRT, NOISELESS SELF-CLOSING,BOTTOM-HINGED, HAND-OPERATED DOOR WITH ACCESSIBLE LEVER HANDLE, RUBBER DOOR BAFFLES.DOOR SHALL BE 1-1/2 HR RATED WITH EMBOSSED LETTERS "WASTE", "RECYCLE" OR "GREEN WASTE".CLEANING ACCESS DOOR - 1-1/2 HOUR FIRE-RATED AT 4+ STORIES, 1 HOUR AT 3 STORIES ORLESS , 15"x15" SIDE-HINGED STAINLESS STEEL BEARING A UL "B" LABEL (AT TOP FLOOR ONLY) TOSANITIZE UNIT OVER TOP OF CHUTE DOOR. VERIFY LOCATION AND COORDINATE WITH CHUTEMANUFACTURER. PROVIDE WATER SUPPLY AS REQUIRED BY CHUTE MANUFACTURER.WASTE, GREEN WASTE OR RECYCLE BINTRASH CHUTE ATTACHMENT AT FLOOR FRAMING, BY MANUFACTURER. PROVIDE VIBRATIONISOLATION OF THE TRASH CHUTE WHERE CONNECTED TO THE BUILDING EQUAL TO MASONINDUSTRIES TYPE BR HAVING 0.2 INCHES OF STATIC DEFLECTIONDISCHARGE: UL LABELED ACCORDION TYPE FIRE DAMPERFLUSHING SPRAY HEAD165 DEGREE SPRINKLERS: LOCATE AT TOP INTAKE, ALTERNATE INTAKES BELOW AND ATFIRST INTAKEFLOOR DRAIN12345678910OPENING IN SLAB OR FLOOR FRAMING FOR MECHANICAL VENTILATION - SEE MECHANICAL PLANSWALL PROTECTION: 10" HIGH X 6" WIDE CURB ALONG THE PERIMETER OF THE TRASH ROOMTRASH COMPACTOR: VERIFY SIZE WITH OWNER'S WASTE MANAGEMENT PLAN. VERIFYPOWER REQUIREMENTS WITH ELECTRICAL ENGINEER PRIOR TO PURCHASE. SLAB UNDERCOMPACTOR IS TO BE FLAT.HOSE BIB - SEE PLUMBING PLANS111213ENLARGED PLAN REFERENCES1.FOR WALL FIRE-RATINGS AND DETAIL REFERENCES, FIRE EXTINGUISHERLOCATIONS AND FIRE ACCESS ANALYSIS, SEE SHEETS A0-11 THRU A0-25 .2.FOR EXITING ANALYSIS INCLUDING OCCUPANT LOADS, EXIT SIGNS AND DOOR PANICHARDWARE LOCATIONS, SEE SHEETS A0-31 THRU A0-45.EXTENT OF EXTERIOR CEMENT PLASTER FINISHDIAGONAL HATCH INDICATES EXTENT OF EXTERIOR PLASTER SOFFIT ORDROPPED GYP. BD. CEILING BELOW RATED FLOOR/CEILING ASSEMBLY. SOFFITHEIGHT AS INDICATED IN PLAN. EXTERIOR CEMENT PLASTER OVER EXTRUDEDMETAL LATH OCCURS AT LOBBIES WITH EXTERIOR WALL OPENINGS. SEEENLARGED PLANS FOR EXTENT.CMU WALL - SEE STRUCTURALCONCRETE WALL - SEE STRUCTURAL2-HOUR RATED SEISMIC EXPANSION JOINT1420AD-23MECHANICAL LOUVER152X4 WALL (1-1/2"x3-1/2" METAL STUD AT TYPE 1A CONSTRUCTION, 2X4FIRE-RETARDANT TREATED WOOD STUD AT ALL OTHER LOCATIONS)2X6 WALL (1-1/2"x5-1/2" METAL STUD AT TYPE 1A CONSTRUCTION, 2X6FIRE-RETARDANT TREATED WOOD STUD AT ALL OTHER LOCATIONS)CONCRETE CURB16ASCALE:11/4"=1'-0"BUILDING A TRASH ROOM SECTION06-21-23