My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 30 - 4th and Mortimer Mixed-Use Development Project Located at 409 and 509 East Fourth Street
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
11/19/2024
>
Item 30 - 4th and Mortimer Mixed-Use Development Project Located at 409 and 509 East Fourth Street
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2024 3:06:42 PM
Creation date
11/15/2024 9:08:22 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
30
Date
11/19/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
306
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INTERIOREXT.EXTERIOR PLASTERGALVANIZED WEEP SCREED W/INTEGRAL SHIELD FLASHING24 GA BONDARIZED 'L'FLASHING - SEE DETAILCONC. TOPPING SLABDRAINAGE MATSLOPE FINISH SURFACE ANDSUBSTRATE PER PLANW.R.B.2" <br />8"4"WATERPROOFING6" WIDE SELF ADHERED FLASHINGO/ WEEP SCREED1-1/2"1/4" ISOLATION STRIP. REMOVE TOP1/4" OF MATERIAL & FILL GAP W/SEALANT MATCHING CONCRETECOLORLAP WEEP OVERHEEL FLASHINGDRAINAGE MATEXTRUDED ALUMINUM "T" W/ 3/8"DIA WEEP HOLES AT 12" O.C.ENSURE HOLES REMAIN CLEARFOR DRAINAGESCUPPER (1) PERGUTTER, CENTERWOOD SHEATHING, PER STRLEXTERIOR PLASTERSELF ADHERED FLASHINGUNDER T-BAR ANDO/ CORNER DRIP SCREEDWOOD STUCCO KEYNOTES:1) REFER TO SMACNA STANDARDS FOR FASTENING &OTHER REQUIREMENTS2) PROVIDE FIELD MOCK-UP OF THIS DETAIL2"1"2"FLUID-APPLIED WATERPROOFINGO/ T-BAR FLANGE. DO NOT COVERWEEP HOLES1 1/2"CONCRETE TOPPING, PER STRL6"6"8 "WRAP BACK, SOLDER ANDSEAL GUTTER AT ENDS8"7/8" WIDEGALVANIZEDDIVERTER W/INTEGRAL STUCCOKEY- WELD TO HEELFLASHING24 GA BONDERIZEDWALL FLASHING HEEL24 GA. GALV 2" WIDE x 2"DEEP WATER TABLEFLASHING, WELD TO HEELFLASHING AND SLOPE 1/4"2"2 1/16"SOFFIT DRIP3"W.R.B OVER SAFEXTEND FLASHING HEELDOWN O/ CORNER DRIPSCREED1/2"4"6-2-BADECK SURFACEGSM "L" FLASHINGCEMCO #7 EXTENDED FOUNDATIONSCREED WITH 1-1/2" EXTENSIONGSM EDGE FLASHINGSADDLE FLASHINGS.A.F.W.R.B.CEMCO # 66 EXPANDED FLANGECASING BEADSUBSTRATESLOPE12" S.A.F.4"S.A.F.4"WALLDECK SURFACEGSM "L" FLASHINGCEMCO #7 EXTENDED FOUNDATIONSCREED WITH 1-1/2" EXTENSIONPRE-MADE CORNER GSM EDGEFLASHINGSADDLE FLASHINGSUBSTRATESLOPEWA <br />L <br />LWALL <br />DECK SURFACEGSM "L" FLASHINGCEMCO #7 EXTENDED FOUNDATIONSCREED WITH 1-1/2" EXTENSIONGSM EDGE FLASHINGSADDLE FLASHINGSUBSTRATESLOPEWA <br />L <br />LWALL <br />SEALANT TO OOZE OUT ANDBUTTERED AT JOINTWALLWA <br />L <br />LDECK EDGE PERPENDICULAR TO WALLDECK EDGE PROTRUDING BEYOND EXTERIOR WALLDECK EDGE FLUSH WITH EXTERIOR WALLWALL EDGE LAPNOTE: ALL FLASHING SEAMS AND LAPS SHALL BE INSTALLED AS TO NOT BUCK WATER.OVERUNDERSUBSTRATESLOPE4"8" <br />4 <br />" <br /> M <br />IN <br />IM <br />UM <br /> <br />L <br />A <br />PLAPPED GSM "L" FLASHING3 BEDS OF SEALANT 1" APARTCONTINUOUS BEAD OF SEALANT ATOVERLAP SEAMGSM "L" FLASHING10"10"DOOR AND THRESHOLD ASSEMBLYPER DOOR SCHEDULEDOOR FLASHING PAN O/ DECKCORNER FLASHING O/ FLASHINGMEMBRANE.W.P.MEMBRANE O/ CORNERDECK FLASHINGCONCRETE TOPPING O/ DRAINAGEMAT O/ W.P. MEMBRANEWALL ASSEMBLY BEYOND4" MINIMUM1/2" MAX.INTERIOR FINISH FLOORFOR ADDITIONAL REQUIREMENTS AND INFORMATION SEE DETAIL4-INTERIOREXTERIORREMOVABLE SOFFIT VENTREMOVABLESOFFIT VENTCONC TOPPING SLABDRAINAGECOMPOSITEPRIME COATFASTENER -PER STRUCTURALCLEAN & DRYPLYWOOD DECKIRC6" POLYESTER REINFORCEMENTSET INTO & COVERED OVER WITHFLUID APPLIED WATERPROOFINGOVER ALL DECK JOINTS &FASTENERSNOTE: CONFIRM ALL INSTALLATIONREQUIREMENTS WITH THEMANUFACTURER. TOP COATIRCFLOOR DRAINDRAIN EXTENSION AS REQUIREDFOR DECK THICKNESSTOPPING SLABCLAMP RINGGROUT SETWEEP OPENINGSFLOOR FRAMING PER STRUCT.DWGS.DRAIN PIPE PER PLUMBINGPLANNOTES:AFTER PAINT REMOVAL PRIME AND COAT BARE METAL IMMEDIATELY AND PRIOR TO ANY RUSTFORMATION.BONDARIZED WALLFLASHING HEEL - WITHFULLY SOLDERED JOINTS -SEEBONDARIZED 'L' METALFLASHING, SEE DETAILSBONDARIZED INSIDECORNER FLASHING -WITH FULLYSOLDERED JOINTSBONDARIZED WALLFLASHING HEEL - WITHFULLY SOLDERED JOINTS- SEE EDGE-TO-WALLTRANSITION DETAIL10-BONDARIZED DOOR PANFLASHING - WITH FULLYSOLDERED SEAMS - SEE3AD-52.06-BONDARIZED OUTSIDECORNER FLASHING -WITH FULLY SOLDEREDJOINTSDECK EDGE SEE DETAIL3-10-10-10-EXT. WALKWAYS AT CORRIDORSTYPICAL FLASHING TRANSITIONSWALL TO DECK FLASHINGDECK EDGE AND GUTTERDECK DRAINDECK FLASHING AT DOOREXTERIORDECK W/ CONC.TOPPING SURFACEAD-56SADDLE FLASHING ASSEMBLY (WALL FLASHING TO DECK EDGE METAL)CCOPYRIGHTIt is the clients responsibility prior to or during construction to notify the architect in writingof any perceived errors or omissions in the plans and specifications of which a contractorthoroughly knowledgeable with the building codes and methods of construction shouldreasonably be aware. Written instructions addressing such perceived errors or omissionsshall be received from the architect prior to the client or clients subcontractors proceedingwith the work. The client will be responsible for any defects in construction if theseprocedures are not followed.Architecture + Planning17911 Von Karman Ave.Suite 200Irvine, CA 92614ktgy.com949.851.2133License StampProject Contact:Email:Principal: Project Designer:Project Director:KTGY Project No:2017-0934Debbie Hollanddholland@ktgy.comWil WongD. SchoolmeesterDebbie HollandDeveloperPHONE NO.4199 CAMPUS DRIVEIRVINE, CA 92612(714) 342-2502415 & 515 E. 4TH STREET, SANTA ANA, CA 92701 <br />4TH AND MORTIMERNo.Date Description06-21-2023 FIFTH BUILDING DEPARTMENT SUBMITTALA03-21-23ADDENDUM A432186121016152019182423221721-----------06-21-23
The URL can be used to link to this page
Your browser does not support the video tag.