Laserfiche WebLink
13. Low Wall Parapet Finish & Termite-Damaged Wood (T&M) (PCO #126). <br /> AGREED COST: $4,514.04 <br /> 14. Vaulted Wood Ceiling Refinishing (PCO#128). <br /> AGREED COST: $5,876.95 <br /> 15. Raceway Removal & Wall Furring (T&M Work) (PCO #129). <br /> AGREED COST: $12,445.32 <br /> 16. BMS Control Panel Power Connection (PCO #130). <br /> AGREED COST: $2,549.01 <br /> 17. FRP at Janitor Room#113 & Wire Mesh at MEP Room 136 (PCO#132). <br /> AGREED COST: $3,765.84 <br /> 18. Exterior Paint Finishes Clarification (PCO #133). <br /> AGREED COST: $3,883.79 <br /> 19. Irrigation Identification & Coordination Prior to Hardscape (T&M) (PCO #136). <br /> AGREED COST: $14,856.44 <br /> 20. Fire Alarm Monitoring Agreement (Avcom Systems Inc.) (PCO #138). <br /> AGREED COST: $1,708,25 <br /> 21. Additional CAT6 Cables-ASI#2 (PCO #142). <br /> AGREED COST: $9,790.62 <br /> 22. Brake Metal at Doors N101 & N102 (PCO #143). <br /> AGREED COST: $1,785.16 <br /> 23. Credit for Site Improvements (Asphalt, ADA Signage, Wheel Stops) Detail on Plan A01.2 (PCO <br /> #144). <br /> AGREED COST: ($14,000.00) <br /> 24. Fan Coil Units Shutdown Integration with Fire Alarm System (PCO#145). <br /> AGREED COST: $6,681.30 <br /> TOTAL AGREED COST: $172,985.40 <br /> Page 2 of 3 <br />