Laserfiche WebLink
Ï <br />Ï <br />PhaseDescription <br />Ï <br />Ï <br />HotelDetailedReport,11/13/2024 <br />Ï <br />WorkDaysperPhase <br />Ï <br />Ï <br />Ï <br />DaysPerWeek <br />Ï <br />32 /45 <br />Ï <br />EndDate <br />Ï <br />Ï <br />Ï <br />StartDate <br />Ï <br />Ï <br />Ï <br />PhaseType <br />Ï <br />ÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏ <br />SequesteredSubtotalÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏRemovedSubtotalÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏAnnualÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏAvoidedSubtotalÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏSequesteredSubtotalÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏRemovedSubtotalÏ <br />ÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏÏPhaseNameSitePreparationSitePreparation1/1/20261/14/20265.0010.0ÏGradingGrading1/15/20262/25/20265.0030.0ÏBuildingConstructionBuildingConstruction2/26/20264/21/202 <br />75.00300ÏPavingPaving4/22/20275/19/20275.0020.0ÏArchitecturalCoatingArchitecturalCoating5/20/20276/16/20275.0020.0Ï <br />5.ActivityData 5.1.ConstructionSchedule5.2.Off-RoadEquipment <br /> <br />