My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 16 -Agreement with Mekong Printing Inc. dba MK Printing for Offset Printing Service
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
12/17/2024
>
Item 16 -Agreement with Mekong Printing Inc. dba MK Printing for Offset Printing Service
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2024 11:44:23 AM
Creation date
12/11/2024 9:41:31 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Finance & Management Services
Item #
16
Date
12/17/2027
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(9) <br />CITY OF SANTA ANA <br />EXHIBIT I <br />SCOPE OF SERVICES <br />Contractor shall perform services as set forth below. <br />A. GENERAL REQUIREMENTS <br />1. All print jobs will be produced to the specification, stock and layout requirements as indicated on <br />each job. <br />a. Approval of the Central Services Supervisor is required prior to any change in the print <br />job's specification. <br />2. All print job quantities printed shall be governed by the City's standard plus or minus five perecent <br />(5%) allowance, no exceptions. <br />B. FINISHING <br />Contractor must be able to provide the following services either in-house or by subcontracting these <br />services out. Proposals must specify which, if any, services are to be subcontracted. If services are <br />subcontracted, then per Section XI. General Terms and Conditions, sub -section Z. Subcontractors: <br />"An official of each proposed Subcontractor must sign, and include as part of the proposal submitted <br />by the Prime Contractor, a statement to the effect that the Subcontractor has read and will agree to <br />abide by the awarded Contractor's obligations." <br />1. Cutting <br />2. Collating <br />3. Numbering <br />4. Drilling <br />5. Shrink Wrapping <br />6. Padding <br />7. Folding <br />8. Stapling <br />9. Perfect Binding <br />C. DELIVERY <br />a. Pick-up of necessities (artwork, supplied stock, dies, etc.) promptly and delivery of printed <br />job(s) within three (3) business days. Contractor must let the City know at time of quotation <br />if any jobs will require a longer turnaround time. <br />2. Completed jobs must be delivered to the location below by 5:00 PM on the due date: <br />City of Santa Ana RFP No. 24-082A Page 16 of 52 <br />
The URL can be used to link to this page
Your browser does not support the video tag.