Laserfiche WebLink
Transit Zoning Code Fees <br />The transit zoning code fees provide a transit -supportive, pedestrian -oriented development framework to <br />reduce vehicle trips, reduce greenhouse gas emissions, and support the addition of new transit infrastructure. <br />Harbor Specific Plan Fees <br />The Harbor Specific Plan fees support improvements made to increase safety along Harbor Boulevard. <br />List the amount of the fee. <br />Drainage Assessment Fee Schedule <br />Areas <br />Effective 7/1/2023 <br />Area 1 <br />$ 8,372.00 <br />Area 2 <br />$ 10,092.00 <br />Area 3 <br />$ 5,433.00 <br />Area 4 <br />$ 8,019.00 <br />Area 5 <br />$ 9,136.00 <br />Area 6 <br />$ 8,985.00 <br />Sewer Connection Fee Schedule: $51.00 per plumbing fixture unit. <br />Water Connection Fee Schedule <br />Meters <br />Effective 7/1/2023 <br />5/8" Meter <br />$ 465.00 <br />3/4" Meter <br />$ 465.00 <br />1" Meter <br />$ 465.00 <br />1 1/2" Meter <br />$ 496.00 <br />2" Meter <br />$ 560.00 <br />3" Meter <br />$ 1,886.00 <br />4" Meter <br />$ 2,815.00 <br />6" Meter <br />$ 4,533.00 <br />Transportation System Improvement Area Fee Schedule <br />Non -Residential Areas <br />Effective 7/1/2023 <br />Area A <br />$ 5.15 / sq. ft. <br />Area B <br />$ 1.81 / sq. ft. <br />Area C <br />$ 5.53 / sq. ft. <br />Area D <br />$ 3.31 / sq. ft. <br />Area E <br />$ 2.01 / sq. ft. <br />Area F <br />$ 1.81 / sq. ft. <br />Residential* <br />Effective 7/1/2023 <br />Area A <br />$ 5.15 / sq. ft. <br />Area B <br />$ 1.81 / sq. ft. <br />