My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ELECNOR BELCO ELECTRIC, INC. (TRAFFIC SIGNAL INSTALLATION AT SEGERSTROM AND SPRUCE STREET)
Clerk
>
Contracts / Agreements
>
PROJECTS
>
ELECNOR BELCO ELECTRIC, INC. (TRAFFIC SIGNAL INSTALLATION AT SEGERSTROM AND SPRUCE STREET)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2024 3:09:24 PM
Creation date
12/11/2024 3:09:20 PM
Metadata
Fields
Template:
Contracts
Company Name
ELECNOR BELCO ELECTRIC, INC.
Contract #
P24-6045
Agency
Public Works
Council Approval Date
10/1/2024
Insurance Exp Date
11/1/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cxrllr)I1 H <br /> CITY OF SANTA ANA <br /> PROPOSAL <br /> PROJECT NO.: 24-6045 <br /> TRAFFIC SIGNAL INSTALLATION AT SEGERSTROM AVENUE AND SPRUCE STREET <br /> BID PROPOSAL <br /> TO: CITY COUNCIL OF THE CITY OF SANTA ANA <br /> FROM: Elecnor Belco Electric, Inc. <br /> REQUIREMENT: <br /> The undersigned bidder declares that they have carefully examined the Iocation of the proposed <br /> work, that they have examined the Contract Documents in its entirety and hereby proposes to <br /> furnish all material and do all the work required to complete the said work in accordance with said <br /> plans (if any) and the specifications for the unit price(s)or lump sum(s) set forth in the following <br /> schedule: <br /> BASE BID <br /> Item Description Qty Unit Unit Price Amount <br /> 1 Traffic Signal Installation at Segerstrom I LS $ $ p00 <br /> Avenue and Spruce Street rh\� Q►7d \�I <br /> 2 Install Video Detection System at Segerstrom 1 LS $ 00 $ 00 <br /> Avenue and Spruce Streets 1 �y 1�Q <br /> 3 Install 2"PVC Conduit 50 LF $ r`G $ 000 <br /> � <br /> 4 *Install 3"PVC Conduit 1200 LF $ $ <br /> A, 100 <br /> 5 Install 4"PVC Conduit 600 LF $ $ 00 <br /> a <br /> 6 Install No.6 Pull Box 9 EA $ 0(7 $ 0 <br /> 7 Install No. 6E Pull Box 2 EA $ 500 p00 <br /> 12 <br /> 8 IP Communication System 1 LS 2� 5 0 Q $ G <br /> 9 *Install 96 Strand SMFO Cable 1700 LF $ (60 $ t7 <br /> \i <br /> 10 Fusion Splice Strands of SMFO 96 EA $ $ .L 0 <br /> 11 Fiber Optic Splice Enclosure 1 EA $ �4" $ 1 7( p <br /> \ � 1 <br /> 12 Remove and Construct PCC Median Nose 120 SF $ 2 $ DIXO <br /> � <br /> (Including Steel Rebar Dowels) V ti� , <br /> 13 Signing and Striping 1 LS $ <br /> P-1 ofP-19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.