My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ELECNOR BELCO ELECTRIC, INC. (TRAFFIC SIGNAL INSTALLATION AT SEGERSTROM AND SPRUCE STREET)
Clerk
>
Contracts / Agreements
>
PROJECTS
>
ELECNOR BELCO ELECTRIC, INC. (TRAFFIC SIGNAL INSTALLATION AT SEGERSTROM AND SPRUCE STREET)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2024 3:09:24 PM
Creation date
12/11/2024 3:09:20 PM
Metadata
Fields
Template:
Contracts
Company Name
ELECNOR BELCO ELECTRIC, INC.
Contract #
P24-6045
Agency
Public Works
Council Approval Date
10/1/2024
Insurance Exp Date
11/1/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br /> PROPOSAL <br /> PROJECT NO.: 24-6045 <br /> TRAFFIC SIGNAL INSTALLATION AT SEGERSTROM AVENUE AND SPRUCE STREET <br /> TOTAL BASE BID—ITEMS 1-17 $ I <br /> ADD ALTERNATE BID <br /> 18 Install APS System at Segerstrom Avenue& 1 LS $ S <br /> Spruce Street \66(6 21 OS <br /> 19 Install GTT Opticom EVP System at I LS $ $ <br /> Scgerstrom Avenue&Spruce Street `9 (j4'j0 ‘97 pe)5 <br /> ti 1 <br /> TOTAL ALTERNATE BID—ITEMS 18-19 $ 5 !0 I P <br /> The lowest responsible bidder shall be selected based on the total base bid. The City reserves the <br /> right to award the Base Bid, and any, all, or none of the add-alternate bid items (if any). <br /> * The quantity for this bid item is shown for bid comparison only. This bid item shall not be <br /> subject to the"25%"limit as stated in Section 7-3.5 of the Standard Specifications. The actual <br /> amount for this item will be dictated by the actual quantity used, and the Agency reserves the <br /> right to increase or decrease the quantity of this item accordingly. <br /> t This bid item is considered a Specialty Item per Section 3-2 of the Standard Specifications. <br /> TIME FOR COMPLETION OF IMPROVEMENTS AND LIQUIDATED DAMAGES <br /> The undersigned bidder hereby proposes to complete the Work for the total base bid amount shown <br /> above, within SIXTY (60) working days after the commencement date stated in the Notice to <br /> Proceed. Upon issuance of the Notice to Proceed, Contractor shall immediately place order for <br /> long-lead time items (i.e. Traffic Signal Poles and Service Meters). <br /> The liquidated damages amount, in lieu of the amount specified in Subsection 6-9 of the Standard <br /> Specifications, shall be$3,600 per calendar day. <br /> Name of Firm Elecnor Belco Electric, Inc. <br /> Signature of BIDDER , John Wong <br /> Title Vice President <br /> (If an individual, so state. If a trm or co-partnership, state the firm name and give the names of <br /> all individual co-partners composing the firm. If a corporation, state legal name of corporation, <br /> and names of President, Secretary, Treasurer and Manager, thereof.) <br /> Alberto Garcia De Los Angeles/President John Wong/Vice President <br /> Pedro Enrile/Secretary Jeroni Gervilla/Chief Financial Officer <br /> P-3 of P-19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.