My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
LEGION CONTRACTORS, INC. (OUTDOOR LIBRARY AT JEROME PARK)
Clerk
>
Contracts / Agreements
>
PROJECTS
>
LEGION CONTRACTORS, INC. (OUTDOOR LIBRARY AT JEROME PARK)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2025 2:40:16 PM
Creation date
12/11/2024 4:56:18 PM
Metadata
Fields
Template:
Contracts
Company Name
LEGION CONTRACTORS, INC.
Contract #
P22-1381 & 25-7523
Agency
Public Works
Council Approval Date
8/20/2024
Insurance Exp Date
11/21/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br /> fi n <br /> :! t PUBLIC WORKS AGENCY <br /> CONTRACT CHANGE ORDER <br /> Project Number Project No. 22-1381; Outdoor Library at Jerome Park Change Order Number 3 <br /> To Legion Contractors, Inc. Contractor <br /> You are hereby directed to make the herein changes from the plans and specifications or do the following described work not included in the plans and <br /> specifications on this contract. <br /> NOTE:THIS CHANGE ORDER IS NOT EFFECTIVE UNTIL APPROVED BY THE CITY COUNCIL OR CITY MANAGER. <br /> Unless otherwise stated,rates for rental of equipment cover only such time as equipment is actually used and no allowance will be made for idle time. <br /> Change requested by PUBLIC WORKS AGENCY <br /> EXTRA WORK AT AGREED PRICE <br /> 1. To compensate the contractor for providing structural engineering calculations and stamped <br /> drawings to the revised slab on grade foundation of the outdoor library. Reference PCO #9 <br /> dated February 26, 2025. <br /> AGREED PRICE =$4,545.00 <br /> 2. To compensate the contractor to remove and replace 990 linear feet of existing curb around <br /> the parking lot. Reference PCO #10 dated March 10, 2025. <br /> AGREED PRICE=$88,605.00 <br /> 3. To compensate the contractor for additional trenching, conduit installation, and wiring for the <br /> revised receptacle mounted to the light post. Reference PCO#11 dated March 27, 2025. <br /> AGREED PRICE=$5,887.98 <br /> TOTAL AGREED PRICE= $99,037.98 <br /> Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.