Laserfiche WebLink
t CITY OF SANTA ANA <br />contactors and (4) ODA switches <br />5. Supplemental Lighting <br />a) (7) OSQ area luminaires <br />B. Services: <br />1. City of Santa Ana Responsibilities <br />a) <br />Complete access to the site for construction utilizing standard 2-wheel drive rubber <br />tire equipment. <br />b) <br />Locate existing underground utilities not covered by your local utilities. (i.e. water <br />lines, electrical lines, irrigation systems, and sprinkler heads). <br />Contractor/Subcontractor will not be responsible for repairs to unmarked utilities. <br />c) <br />Shut-off irrigation system at park at least one week prior to start of construction. <br />Irrigation systems to remain off during construction timeframe. <br />d) <br />Close playing fields to activities from 6AM — 5PM, Monday -Friday, during project. <br />e) <br />Pay for extra costs associated with foundation design that differs from the <br />preliminary foundation design provided with this proposal once the geotechnical <br />report has been provided; as well as excavation in non-standard soils (rock, <br />caliche, high water table, collapsing holes, etc.) or soils not defined in geotechnical <br />report. <br />f) <br />The following requirements are met for the new panel and pad being installed in <br />the restroom building project: <br />i. Panel MP increased to 250A panel (assuming 240v/1phase), and a <br />minimum of (8) spare spaces in the panel for the addition of 2-pole circuit <br />breakers. <br />ii. The concrete pad where the meter pedestal and panel MP are being <br />installed is increased in size to accommodate a 30" wide x 36" deep <br />enclosure (with 36" clear in front and back of this pad) for installation of <br />sports lighting controls. <br />iii. (1) 4" conduit from meter pedestal to new sports lighting controls pad (see <br />above). <br />iv. (4) 2" conduits from expanded lighting controls pad, stubbed out north to <br />the grass playing field area. <br />g) <br />Contractor will submit plans to the City for plan check, and pull permits once plans <br />are approved. City of Santa Ana to pay all plan check and permit fees, and any <br />fees associated with special inspections. <br />h) <br />Provide laydown area on site for dumpsters, equipment containers, etc. <br />2. Contractor Responsibilities <br />a) Provide required foundations, poles, electrical enclosures, luminaires, wire <br />harnesses, and control cabinets. <br />b) Provide layout of pole locations and aiming diagram. <br />c) Provide Project Management as required. <br />d) Provide stamped structural calculations and foundation designs based on soil <br />parameters as outlined in the geotechnical report. Geotechnical services include <br />field observation during hole auguring for foundations. Any other special <br />inspections required are provided by the City. <br />e) Submit electrical and structural plans to the City Building Department for approval. <br />City to pay cost of plan -check. <br />f) Assist our installing subcontractor and ensure our responsibilities are satisfied. <br />g) Conduct site walk with the Park Inspector to perform irrigation and area lighting <br />