My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R&M ELECTRICAL CONTRACTING (RMF CONTRACTING, INC.)
Clerk
>
Contracts / Agreements
>
R
>
R&M ELECTRICAL CONTRACTING (RMF CONTRACTING, INC.)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2024 10:38:28 AM
Creation date
12/12/2024 10:33:21 AM
Metadata
Fields
Template:
Contracts
Company Name
R&M ELECTRICAL CONTRACTING (RMF CONTRACTING, INC.)
Contract #
A-2024-206
Agency
Public Works
Council Approval Date
12/3/2024
Expiration Date
12/2/2027
Insurance Exp Date
1/1/1900
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />c) Foundations, Poles, and Luminaires: <br />i. Mark and confirm pole locations per the aiming diagram provided. If there are <br />any issues, immediately notify your Project Manager. <br />ii. Provide labor, materials, and equipment to install (7) LSS foundations as <br />specified on Layout and per the stamped foundation drawings. <br />iii. Remove spoils from site and deposited at City yard. <br />iv. Provide labor, materials, and equipment to assemble (32) Musco TLC -LED <br />or equivalent luminaires, electrical component enclosures, poles, and pole <br />harnesses. <br />V. Provide labor, materials, and equipment to assemble (7) Cree OSQ area - <br />light luminaires. <br />vi. Provide labor, equipment, and materials to erect (7) dressed LSS Poles and <br />aim utilizing the pole alignment beam. <br />d) Electrical: <br />i. Provide labor, materials, and equipment to install new breakers as needed in <br />existing panel MP (240v/1 Ph). <br />ii. Provide labor, materials, and equipment to intercept City -installed conduits <br />from panel MP in the grass area and install all underground conduit, wiring, <br />pull boxes etc. and terminate wiring as required for the sports lighting and <br />area lighting. <br />iii. Provide as -built drawings on completion of installation. <br />e) Control System: <br />i. Provide NEMA 3R painted steel cabinet to house new lighting controls. <br />Provide labor, equipment, and materials to install new 3R cabinet on <br />extended concrete pad adjacent to panel MP. Panel MP and extended pad <br />provided by City. <br />ii. Provide labor, equipment, and materials to install control and monitoring <br />cabinet(s) and terminate all necessary wiring. <br />iii. Provide a dedicated 120 V 20 A controls circuit or a step-down transformer <br />for 120 V control circuit if not available. <br />iv. Check all zones to make sure they work in both auto and manual mode. <br />V. Commission Control -Link® by contacting Control -Link CentralTm at 877-347- <br />3319. <br />
The URL can be used to link to this page
Your browser does not support the video tag.