My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R&M ELECTRICAL CONTRACTING (RMF CONTRACTING, INC.)
Clerk
>
Contracts / Agreements
>
R
>
R&M ELECTRICAL CONTRACTING (RMF CONTRACTING, INC.)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2024 10:38:28 AM
Creation date
12/12/2024 10:33:21 AM
Metadata
Fields
Template:
Contracts
Company Name
R&M ELECTRICAL CONTRACTING (RMF CONTRACTING, INC.)
Contract #
A-2024-206
Agency
Public Works
Council Approval Date
12/3/2024
Expiration Date
12/2/2027
Insurance Exp Date
1/1/1900
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />V. Contact the facility owner/manager to confirm the existing private <br />underground utilities and irrigation systems have been located and are <br />clearly marked to avoid damage from construction equipment. Notify owner <br />and repair damage to marked utilities. Notify owner and Contractor regarding <br />damage which occurred to unmarked utilities. <br />vi. Provide labor, equipment, and materials to off load equipment at jobsite per <br />scheduled delivery. <br />vii. Provide storage containers for material, (including electrical components <br />enclosures), as needed. <br />viii. Provide necessary waste disposal and daily cleanup. <br />ix. Provide adequate security to protect the jobsite, and delivered products from <br />theft, vandalism, or damage during the installation. <br />X. Keep all heavy equipment off playing fields when possible, provide ground <br />protection as needed to minimize damage to existing grounds. Repair <br />damage to grounds which exceeds that which would be expected. <br />Indentations caused by heavy equipment traveling over dry ground would be <br />an example of expected damage. Ruts and sod damage caused by <br />equipment traveling over wet grounds would be an example of damage <br />requiring repair. <br />xi. Provide startup and aiming as required to provide complete and operating <br />sports lighting system. <br />A. Installation to commence upon delivery and proceed without interruption until <br />complete. Notify Contractor immediately of any breaks in schedule or delays. <br />xiii. Shall sod trenches to match existing conditions. <br />b) Foundations, Poles, and Luminaires: <br />i. Mark and confirm pole locations per the aiming diagram provided. If there are <br />any issues, immediately notify your Project Manager. <br />ii. Provide labor, materials, and equipment to install (3) LSS foundations as <br />specified on Layout and per the stamped foundation drawings. <br />iii. Remove spoils from site and deposited at City yard. <br />iv. Provide labor, materials, and equipment to assemble (9) Musco TLC -LED or <br />equivalent luminaires, electrical component enclosures, poles, and pole <br />harnesses. <br />V. Provide labor, materials, and equipment to assemble (3) Cree OSQ area - <br />light luminaires. <br />vi. Provide labor, equipment, and materials to erect (3) dressed LSS Poles and <br />aim utilizing the pole alignment beam. <br />c) Electrical: <br />i. Provide labor, materials, and equipment to install new breakers as needed in <br />existing panel located in adjacent park building. <br />ii. Provide labor, materials, and equipment to install all underground conduit, <br />wiring, pull boxes etc. and terminate wiring as required for the sports lighting <br />and area lighting. <br />iii. Provide as -built drawings on completion of installation. <br />d) Control System: <br />i. Provide labor, equipment, and materials to install control and monitoring <br />cabinet(s) and terminate all necessary wiring. <br />ii. Provide a dedicated 120 V 20 A controls circuit or a step-down transformer <br />for 120 V control circuit if not available. <br />
The URL can be used to link to this page
Your browser does not support the video tag.