Laserfiche WebLink
0 CITY OF SANTA ANA <br />light luminaires. <br />vi. Provide labor, equipment, and materials to erect (10) dressed LSS Poles and <br />aim utilizing the pole alignment beam. <br />d) Electrical: <br />i. Provide labor, materials, and equipment to install new breakers as needed in <br />existing panel MP (240v/1Ph). <br />ii. Provide labor, materials, and equipment install all underground conduit, <br />wiring, pull boxes etc. and terminate wiring as required for the sports lighting <br />and area lighting. <br />iii. Provide as -built drawings on completion of installation. <br />e) Control System: <br />i. Provide stainless steel cabinet to match existing switch -gear enclosures to <br />house new lighting controls. Provide labor, equipment, and materials to <br />extended concrete pad where existing panel is located and install new <br />enclosure and Control -Link lighting controls within the enclosure. <br />ii. Provide labor, equipment, and materials to install control and monitoring <br />cabinet(s) and terminate all necessary wiring. <br />iii. Provide a dedicated 120 V 20 A controls circuit or a step-down transformer <br />for 120 V control circuit if not available. <br />iv. Check all zones to make sure they work in both auto and manual mode. <br />V. Commission Control -Lk® by contacting Control -Link CentralTM at 877-347- <br />331 <br />