My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
NS-3072 - Repealing and Reenacting in Its Entirety Article XXI to Chapter 8 of the Santa Ana Municipal Code Prohibiting Short-Term Rentals
Clerk
>
Ordinances
>
2021 - 2030 (NS-3001 - NS-XXXX)
>
2024 (NS-3055 - NS-3073)
>
NS-3072 - Repealing and Reenacting in Its Entirety Article XXI to Chapter 8 of the Santa Ana Municipal Code Prohibiting Short-Term Rentals
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2025 7:27:05 AM
Creation date
12/16/2024 8:28:07 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Ordinance
Agency
Planning & Building
Doc #
NS-3072
Item #
35
Date
12/3/2024
Destruction Year
P
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
m Provide changing/shower ing/ shower facilities as specified in Section A5.106.4.3 of the CALGreen <br />Code (Nonresidential Voluntary Measures). <br />E Provide bicycle parking facilities per Section A4.106.9 (Residential Voluntary Measures) <br />of the CALGreen Code and Sec. 41-13 07.1 of the Santa Ana Municil2al Code. <br />m Provide preferential parking spaces for low -emitting, fuel -efficient, and carpool/van <br />U., <br />vehicles per Section A5.106.5.1 of the CALGreen Code (Nonresidential Voluntary <br />Measures). <br />E Provide facilities to support electric charging stations per Section A5.106.5.3 <br />(Nonresidential Voluntary Measures) and Section A5.106.8.2 (Residential Voluntary <br />Measures) of the CALGreen Code. <br />0 Applicant -provided appliances (e.g., dishwashers, refrigerators, clothes washers, and <br />dryers) shall be Energy Star —certified appliances or appliances of equivalent energy <br />efficiency. Installation of Energy Star —certified or equivalent appliances shall be verified <br />by Building & Safety during plan check. <br />w Applicants for future development projects along existing and planned transit routes shall <br />coordinate with the City of Santa Ana and Orange County Transit Authority to ensure <br />that bus pad and shelter improvements are incorporated, as appropriate. <br />AQ-3 Prior to discretionary approval by the City of Santa Ana, project applicants for new industrial <br />or warehousing development projects that 1) have the potential to generate 100 or more diesel <br />truck trips per day or have 40 or more trucks with operating diesel -powered transport <br />refrigeration units, and 2) are within 1,000 feet of a sensitive land use (e.g., residential, schools, <br />hospitals, or nursing homes), as measured from the property line of the project to the property <br />line of the nearest sensitive use, shall submit a health risk assessment (HRA) to the City of <br />Santa Ana for review and approval. The HRA shall be prepared in accordance With policies <br />and procedures of the State Office of Environmental Health Hazard Assessment and the <br />South Coast Air Quality Management District. If the HRA shows that the incremental cancer <br />risk and/or noncancer hazard index exceed the respective thresholds, as established by the <br />South Coast AQMD at the time a project is considered, the project applicant will be required <br />to identifyi <br />and demonstrate that best available control technologiq es for toxics (T' BACTs), <br />including appropriate enforcement mechanisms, are capable of reducing potential cancer and <br />noncancer risks to an acceptable level. T-BACTs may include, but are not limited to, restricting <br />idling on -site, electrifying warehousing docks to -reduce diesel particulate matter, or requiring <br />use of newer equipment and/or vehicles. T BACTs identified in the HRA shall be identified <br />as mitigation measures in the environmental document and/or incorporated into the site plan. <br />AQ-4 Prior to discretionary approval by the City of Santa Ana, if it is determined that a development <br />project has the potential to erin't nuisance odors beyond the property line, an odor <br />management plan shall be prepared by the project applicant and submitted to the City of Santa <br />Ordinance NS-3072 <br />
The URL can be used to link to this page
Your browser does not support the video tag.