Laserfiche WebLink
RE -ADVERTISEMENT <br />20 <br />Furnish & Install Overhead Reflectorized Street Name <br />EA <br />Sign (RSNS) <br />4 <br />21 <br />Install City Furnished Overhead Reflectorized Street <br />EA <br />Name Sin RSNS <br />4 <br />22 <br />Furnish & Install 12 Strand Single Mode Fiber Optic <br />LF <br />(SMFO) Cable <br />300 <br />23 <br />Furnish & Install 24 Strand Single Mode Fiber Optic <br />LF <br />(SMFO) Cable <br />300 <br />24 <br />Furnish & Install 144 Strand Single Mode Fiber Optic <br />LF <br />(SMFO) Cable <br />1000 <br />25 <br />Furnish & Fusion Splice 1 Stand SMFO <br />48 <br />EA <br />26 <br />Furnish & Fiber Optic Splice Enclosure <br />2 <br />EA <br />27 <br />Pothole Pole Locations for Utility Conflicts <br />5 <br />EA <br />28 <br />Furnish and Install 3-M Vinyl Wrap by Econolite for <br />GA <br />T e 332 Cabinet <br />5 <br />Sample Task Order B — Street Lighting <br />(Assume all work within Paved areas) <br />Item <br />Description <br />Qty <br />Unit <br />Unit Price <br />Total <br />1 <br />Furnish & Install Meter Service Pedestal per C.O.S.A. <br />1 <br />EA <br />Std. Plan on New Foundation <br />2 <br />Furnish & Install Double King Street Light Pole per <br />1 <br />EA <br />C.O.S.A. Std. I I26A on New Foundation <br />3 <br />Furnish & Install Single King Street Light Pole per <br />1 <br />EA <br />C.O.S.A, Std. 1126E on New Foundation <br />4 <br />Furnish & Install Ameron Street Light Pole per <br />I <br />EA <br />C.O.S.A. Std. 1126H on New Foundation <br />5 <br />Furnish & Install #8 AWG Wire (Copper) <br />100 <br />LF <br />6 <br />Furnish &Install #10 AWG Wire (Coper) <br />LF <br />7 <br />Furnish & Install #12 AWG Wire (Copper) <br />..100 <br />100 <br />LF <br />8 <br />Furnish & Install #6 AWG Overhead Wire (Aluminum) <br />100 <br />LF <br />9 1 <br />Furnish & Install 2" Conduit PVC Schedule 40 <br />100 <br />LF <br />10 <br />Furnish & Install 3" Conduit PVC Schedule 40 <br />100 <br />LF <br />I I <br />Furnish & Install No. 3 Pull Box <br />4 <br />EA <br />12 <br />Furnish & Install No. 5 Pull Box <br />1 <br />EA <br />Sample Task Order C --- Concrete Pavia - Wheel Chair Ramps <br />]Item <br />Description <br />Qty <br />Unit <br />Unit Price <br />Total <br />l <br />Unclassified Excavation <br />550 <br />CY <br />2 <br />PCC Sidewalk (T=4") <br />2,500 <br />SF <br />3 <br />PCC Curb Ramp <br />3,000 <br />SF <br />4 <br />PCC Curb and Gutter (C.O.S.A. Std. Plan 1101, Type <br />A-2-8) <br />100 <br />LF <br />5 <br />PCC Curb (C.O.S.A. Std. Plan 1101, Type B-1) <br />100 <br />LF <br />6 <br />PCC Spandrel (C.O.S.A. Std. Plan 1109) <br />500 <br />SF <br />City of Santa Ana RFP 21-095 <br />Exhibit Page Al-3 <br />