Laserfiche WebLink
�r�s ors <br />Electrical Date, ho. <br />EDUCATION <br />JAMM P. NEI SON <br />SUPERINTENDENT <br />5454 Diaz St., Irwindale, CA 91706 <br />626-813-6693 • 626-869-0192 Fax <br />Monrovia High School, Monrovia, CA, High School Diploma,1992 <br />CERTIFICATIONS <br />• Certified Fiber Optics Installer (FO1124993) <br />• Certified Fiber Optics Technician Outside Plant (FOSP126651) <br />• OSHA 30 Certified <br />• OSHA 10 Certified <br />WORT( HISTORY <br />Crosstown Electrical & Data — Fiber Splicer <br />2011-Current <br />• Responsible for the installation, termination and splicing of fiber optic cables. <br />• Responsible for the testing of fiber optic cable using OTDR and Power Meters/Light Source <br />• Responsible for analyzing the OTDR and power meter results. <br />Lincoln Pacific Builders-- Fiber Splicer and Electronics Integration 2009-2011 <br />• Responsible for the Installation, termination and splicing of fiber optic cables. <br />• Responsible for the testing of fi ber optic cable using OTDR and Power Meters/light Source <br />• Responsible for the installation and integration of all video and data equipment modems, <br />transceivers, CCTV and VDS cameras <br />Corban Electric & Data, Inc. -- Field Supervisor 2008-2009 <br />• Managed all personnel in the field responsible for fusion splicing <br />• Responsible fortake-offs and ordering of job materials <br />• Verified and approved all employee time cards <br />Dynalectric — Fiber Splicer and Electronics Integration 2005-2008 <br />Responsible for the installation, termination and splicing of fiber optic cables. <br />Responsible for the termination and testing of fiber optic cables using OTDR and power meter. <br />Responsible for the installation and Integration of all video and data equipment modems, <br />Transceivers, CCTV and VDS cameras <br />REFERENCE PROJECTS: <br />City of Glendale, Traffic Signal and ITS Improvement Project-- Furnish/install fiber distribution <br />units and splice closures and perform splicing, termination and testing of fiber optic cable. <br />City of Oxnard, Intelligent Transportation System Project — Perform splicing, termination and <br />testing of 144 SM, 96 SM, 48 SM, 24 SM and 6 SM fiber installed on the project. <br />City of Fullerton, Brea Blvd., Commonwealth Ave, Lemon St., Anaheim Blvd — Perform splicing, <br />termination and testing of fiber cable, <br />