My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 14 - Approve Agreements for On-Call Construction Services
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
08/16/2022 Regular
>
Item 14 - Approve Agreements for On-Call Construction Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2024 9:32:12 AM
Creation date
12/18/2024 8:21:31 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
14
Date
8/16/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
153
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RICARDO A.vII A. <br />SUPERINTENDENT <br />Olt 5454 Diaz St., Irwindale, CA 91706 <br />626-813-6693 • 626-869-0192 Pax • Ricardo.Avila@crosstowndata.com <br />EDUCATION <br />Electrical Training Institute, State Certified Electrician, 2013 <br />Los Angeles Trade Technical College, Electrical Construction and Maintenance Certificate <br />CERTIFICATIONS <br />• OSHA 10/30 Certified <br />• Lead and Asbestos Certified <br />• Trench Excavation Safety Trained <br />WORK HISTORY <br />Crosstown Electrical & Data, Inc. —Superintendent 2009 -- Current <br />• Supervise multiple crews for construction and electrical installations from start to finish. <br />• Procure material for projects as required. <br />• Communicate with Owners and General Contractors to meet project goals and deadlines. <br />• Manage project budgets and perform tracking of all Time & Material work. <br />• Utilize an in-depth knowledge of various construction plans, products and supplies to maximize <br />project effectiveness and profitability. <br />• Strive for all projects to come in on time and within budget at completion. <br />• Coordinate construction schedules with general contractors. <br />• Utilize expertise in the installation of conduit, pull boxes, fiber optic cable, copper cable, wire, <br />traffic signals, cabinets and various other skills to perform field work and to train others. <br />RECENT REFERENCE PROJECTS: <br />• OCTA Adams Ave RTSSP Project (Huntington Reach) <br />• OCTA Newport Ave/Blvd Corridor TSSP (City of Tustin & County of orange) <br />• OCTA Bristol Street RTSSP (Newport, Costa Mesa & Santa Ana) <br />• OCTA Chapman Corridor TSSP (Garden Grove, City of Orange, & County of orange) <br />• Caltrans Contract 07A3661-C — Electrical System Restoration to As -Build Condition in Ventura <br />County. <br />• Caltrans Contract 07A3662-B — Electrical System Restoration to As -Build Condition in Los <br />Angeles County. <br />• Caltrans 07-293804 —Modify Communication System at Route 110/405 separation to Imperial <br />• Caltrans 07-308604— Upgrade ramp metering systems <br />
The URL can be used to link to this page
Your browser does not support the video tag.