Laserfiche WebLink
RE-ADVERTTSEMENT <br />20 <br />Furnish & Install Overhead Reflectorized Street Name <br />FA <br />$ 1,050.00 <br />$ 4,200.00 <br />Sign RSNS <br />4 <br />21 <br />Install City Furnished Overhead R.eflectorized Street <br />Name Sin SNS <br />4 <br />EA <br />$ 450.00 <br />$ 1,800.00 <br />22 <br />Furnish & Install 12 Strand Single Mode Fiber Optic <br />LF <br />$ 3.15 <br />$ 945.00 <br />SMFO Cable <br />300 <br />23 <br />Furnish & Install 24 Strand Single Mode Fiber Optic <br />SMFO Cable <br />300 <br />$ 4.75 <br />$ 1,425.00 <br />24 <br />Furnish & Install 144 Strand Single Mode Fiber Optic <br />LF <br />(SMFO) Cable <br />1000 <br />6.30 <br />6 300.00 <br />25 <br />Furnish & Fusion. Splice 1 Stand SMFO <br />48 <br />EA <br />$ 42.00 <br />$ 2,016.00 <br />26 <br />Furnish & Fiber Optic Splice Enclosure <br />2 <br />EA <br />800.00 <br />4,000.00 <br />27 <br />Pothole Pole Locations for Utility Conflicts <br />5 <br />EA <br />17630.00 <br />8,150.00 <br />28 <br />Furnish and Install 3 M Vinyl Wrap by Econolite for <br />EA <br />Type 332 Cabinet <br />5 <br />2,090.001 <br />10 450.00 <br />Sample Task Order B — Street Lighting <br />Assume all work }within Paved areas) <br />item <br />Description <br />Qty <br />Unit <br />Unit Price <br />Total <br />1 <br />Furnish & Install Meter Service Pedestal per C.O.S.A. <br />Std. Plan on New Foundation <br />1 <br />EA <br />11,875.00 <br />11,875.00 <br />2 <br />Furnish & Install Double King Street Light Pale per <br />C.O.S.A. Std. 1126A on New Foundation <br />1 <br />EA <br />$ 20, 830.00 <br />$ 20,830.00 <br />3 <br />Furnish & Install Single King Street Light Pole per <br />C.O.S.A. Std. 1126E on New Foundation <br />I <br />EA <br />$ 15,260.00 <br />$ 15,26D.00 <br />4 <br />Furnish & Install Ameron Street Light Pole per <br />C.O.S.A. St& 112611 on New Foundation <br />1 <br />EA <br />9,865.00 <br />9,865.00 <br />5 <br />Furnish & Install #8 AWG Wire (Copper) <br />100 <br />LF <br />$ 2.00 <br />$ 200.00 <br />6 <br />Furnish & Install 010 AWG Wire (Copper) <br />100 <br />LF <br />$ J.fio <br />150.00 <br />7 <br />Furnish & Install #12 AWG Wire (Copper) <br />100 <br />LF <br />1.50 <br />150.00 <br />8 <br />Furnish & Install 06 AWG Overhead Wire Aluminum <br />100 <br />LF <br />$ 10.00 <br />$ 1, 000.00 <br />9 1 <br />Furnish & Install 2" Conduit PVC Schedule 40 <br />100 <br />LF <br />$ 125.00 <br />12, 500.00 <br />10 <br />Furnish & Install 3" Conduit PVC Schedule 40 <br />100 <br />LF <br />11 <br />Furnish & Install No. 3 Pull Box <br />4 <br />EA <br />2 080.00 <br />8 320.00 <br />12 <br />Furnish & Install No. 5 Pull Box <br />1 <br />EA <br />$ 2,875.001 <br />$ 2,875.00 <br />Sample Task Order C _.. Concrete paving - Wheel Chair Ramps <br />Item <br />Description <br />Qq <br />Unit <br />Unit Price <br />Total <br />1 <br />Unclassified Excavation <br />550 <br />CY <br />It 81.00 <br />33 550.00 <br />2 <br />PCC Sidewalk (T=4") <br />2,500 <br />SF <br />$ 17.25 <br />$ 43,125.00 <br />3 <br />PCC Curb Ramp <br />3,000 <br />SF <br />51.00 <br />$153,000.00 <br />4 <br />PCC Curb and Gutter (C.O.S.A. Std. Plan 1101, Type <br />A-2-8 <br />100 <br />LF <br />1 <br />5 <br />PCC Curb (C.O.S.A. St& Plan 1101, Type B-1) <br />100 <br />LF <br />100.00 <br />$10,000.00 <br />6 1 <br />PCC Spandrel (C.O.S.A. Std. Plan 1109) <br />500 <br />SF <br />$ 55.00 <br />$ 27,500.00 <br />City of Santa Ana RFP 21-095 <br />Exhibit Page A1-3 <br />