My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 14 - Approve Agreements for On-Call Construction Services
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
08/16/2022 Regular
>
Item 14 - Approve Agreements for On-Call Construction Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2024 9:32:12 AM
Creation date
12/18/2024 8:21:31 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
14
Date
8/16/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
153
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PAVEMENT REHAB COMPANY <br />Labor and Equipment Rates <br />Effective; <br />4 19 2022 <br />LABOR RATES <br />Classification <br />Standard Time <br />Time and a Half <br />Double Time <br />Superintendent <br />$220.00 <br />$330.00 <br />$440,00 <br />Foreman <br />$190.00 <br />$285.00 <br />$380.00 <br />Grade Checker <br />$145.00 <br />$217.50 <br />$290.00 <br />Labor/Raker <br />$135,00 <br />$202.50 <br />$270.00 <br />Finisher/mason <br />$135.00 <br />$202.50 <br />$270.00 <br />BG Operator <br />$145.00 <br />$217.50 <br />$290.00 <br />Operator <br />$145.00 <br />$217.50 <br />$290.00 <br />Screedman <br />$145.00 <br />$217.50 <br />$290.00 <br />Rollerman <br />$145.00 <br />$217.50 <br />$290.00 <br />EQUIPMENT RATES <br />E ui . Operated <br />Rate per HR <br />Equip. Operated <br />Rater HR <br />Equip. Operated <br />Rate per HR <br />Paving Machine (10') <br />$300.00 <br />Skip Loader <br />$265.00 <br />Truck - Super 10 <br />$195.00 <br />Paving Machine (7-8') <br />$260.00 <br />Skip Combo <br />$295.00 <br />Truck -10 Wheel <br />$190.00 <br />Bobtail <br />$240,00 <br />Blade 12G <br />$265.00 <br />Truck - Semi <br />$200.00 <br />Bobtail w/Breaker <br />$270.00 <br />Blade 140G <br />$275.00 <br />Truck -Nigh Side <br />$225.00 <br />Bobtail w/Sweeper <br />$255.00 <br />Backhoe <br />$275.00 <br />Tack Truck <br />$235.00 <br />Bobtail w/Grinder <br />$635.00 <br />Backhoe w/Breaker <br />$345.00 <br />Tack Wagon <br />$115.00 <br />AC Grinder (4') <br />$805.00 <br />950 Loader <br />$300.00 <br />Conc Farm Truck <br />$110 + Mat. <br />AC Grinder (6'-8') <br />$1,035.00 <br />966 Loader <br />$355.00 <br />Crew Truck <br />$115.00 <br />Water Truck <br />$210.00 <br />Roller (5-8 tn) <br />$155.00 <br />Street Sweeper <br />$240.00 <br />Concrete Saw <br />$260.00 <br />Roller (3-5 tn) <br />$135.00 <br />Arrow Board <br />$115.00 <br />Core Machine <br />$260.00 <br />Berm Machine <br />$150.00 <br />Mobilization <br />2 HRs/Equipment <br />- Min. one Way <br />Note. <br />1) Rates include Supervision, Overhead & Profit. <br />2) Price is valid for 1 year from submission date. <br />3) Labor rates are billed with 4 or 8 hour clauses. <br />4) Equip. & Labor moved for specifically for extra work to be billed with 8 hour rein. <br />
The URL can be used to link to this page
Your browser does not support the video tag.