Leighton
<br />METHOD $/TEST
<br />*REINFORCING STEEL AND PRESTRESSING STRANDS
<br />Rebar tensile test, < up to No. 11 (ASTM A370)................................................65
<br />a
<br />Rebar tensile test, ? No. 14 & over (ASTM A370)...........................................200
<br />Rebar bend test, up to No. 11 (ASTM A370)......................................................65
<br />Rebar bend test, >_ No. 14 & over(ASTMA370)..............................................200
<br />Resistance butt -welded hoopslbars, tensile test, <- up to No. 10 (CTM 670)....65
<br />Resistance butt -welded hoopslbars, tensile test, z No. 11 & over (CTM 670)...85
<br />i
<br />Mechanical rebar splice, tensile test, <- up to No. 11 (CTM 670).......................65
<br />Mechanical rebar splice, slip test, 15 up to No. 11 (CTM 670)............................40
<br />Mechanical rebar splice, tensile test, >- No. 14 & over (CTM 670)..................200
<br />e
<br />Mechanical rebar splice, slip test, ? No. 14 & over (CTM 670).......................200
<br />Headed rebar splice, tensile test, <_ up to No. 11 (CTM 670) ............................65
<br />Headed rebar splice, tensile test, >- No. 14 & over (CTM 670) .....................-200
<br />Epoxy coated rebar/dowel film thickness (coating) test (ASTMA775IA934).... ...45
<br />Epoxy coated rebar/dowel continuity (Holiday) test (ASTM A7751A934).............65
<br />Epoxy coated rebar flexibility/bend test, up to No. 11 (ASTM A7751A934)..........
<br />45
<br />Prestressing wire, tension (ASTM A416).........................................................175
<br />-
<br />Sample preparation (cutting).........................................................................50
<br />FEE SCHEDULE
<br />METHOD $/TEST
<br />STREET LIGHTSISIGNALS
<br />LED Luminaires 1 Signal Modules 1 Countdown Pedestrian Signal Face
<br />Modules (Caltrans RSS 86).............................................................. .......... 1,300
<br />SPRAY APPLIED FIREPROOFING
<br />Unit weight (density. ASTM E605).....................................................................
<br />60
<br />FASTENERS / BOLTS I RODS
<br />F3125 GR A307, A325 Bolts, tensile test,:5 up to 1-114" diameter, plain
<br />(ASTM A370),........................,........................,............,.................................65
<br />F3125 GR A307, A325 Bolts, tensile test, :5 up to 1-1/4" diameter,
<br />galvanized (ASTM A370)...............................................................................75
<br />A490 Bolts, tensile test, <- up to 1-114" diameter, plain (ASTM A370)................65
<br />A490 Bolts, tensile test, 5 up to 1-1/4" diameter, galvanized (ASTMA370) ......
<br />75
<br />A593 Bolts, tensile test, 5 up to 1-1/4" diameter, stainless steel (ASTMA370) ...
<br />65
<br />F1554 Bolts, tensile test, :5 up to 1-114" diameter, plain (ASTM A370)............100
<br />F1554 Bolts. tensile test, E up to 1-1/4" diameter, galvanized (ASTMA370)...
<br />120
<br />SAMPLE TRANSPORT
<br />Pick-up & delivery (weekdays, per trip, <50 mile radius from Leighton office) ...
<br />90
<br />4- EQUIPMENT LIST
<br />ITEM $UNIT
<br />114 inch Grab plates............................................................................. 5 each
<br />114 inch Tubing (bonded),...................................................................0.55
<br />foot
<br />1/4 inch Tubing (single)......................................................................
<br />0.35
<br />foot
<br />3/8 inch Tubing, clear vinyl................................................................
<br />0,55
<br />foot
<br />4-Gas meter (RKI Eagle or similar)IGEM 2000...................................130
<br />day
<br />Air flow meter and purge pump (200 cc/min).........................................
<br />50
<br />day
<br />Box of 24 soil drive -sample rings.........................................................120
<br />box
<br />Brass sample tubes .................. ..................... ........................................
<br />10 each
<br />Caution tape (1000-foot roll)..................................................................
<br />20 each
<br />Combination lock or padlock.................................................................11
<br />each
<br />Compressed air tank and regulator.......................................................
<br />50
<br />day
<br />Concrete coring machine (:56-inch-dia)...............................................150
<br />day
<br />Consumables (gloves, rope, soap, tape, etc.).......................................35
<br />day
<br />Core sample boxes................................................................................11
<br />each
<br />Crack monitor Two-Dimensional............................................................
<br />25
<br />each
<br />Crack monitor Thee-Dimensional..........................................................
<br />30 each
<br />Cutoff saws, reciprocating, electric (Sawzall®).....................................
<br />75
<br />day
<br />D-Meter Walking Floor Profiler ............................................................100
<br />day
<br />Disposable bailers.................................................................................12
<br />each
<br />Disposable bladders..............................................................................10
<br />each
<br />Dissolved oxygen meter........................................................................45
<br />day
<br />DOT 55-gallon containment drum with lid .............................................
<br />65 drum
<br />Double -ring infiltrometer......................................................................125
<br />day
<br />Dual -stage interface probe.. ...................................................................
<br />80
<br />day
<br />Dynamic Cone Penetrometer..............................................................400
<br />day
<br />Generator, portable gasoline fueled, 3,500 watts ..................................
<br />90
<br />day
<br />Global Positioning System/Laser Range Finder ....................................
<br />80
<br />day
<br />Handauger set......................................................................................
<br />90
<br />day
<br />HDPE safety fence (s100 feet)............................................................
<br />40
<br />roll
<br />110 Horiba U-51 water quality meter..........................................................135
<br />day
<br />Light tower (towable vertical mast)......................................................150
<br />day
<br />Magnehelicgauge.................................................................................15
<br />day
<br />Manometer............................................................................................25
<br />day
<br />110 Mileage (IRS Allowable)................................................................... 0.585 mile
<br />ITEM
<br />$ UNIT
<br />Moisture test kit (excludes labor to perform test, ASTM E1907) ...........
<br />60
<br />test
<br />Nuclear moisture and density gauge....................................................88
<br />day
<br />Electrical moisture and density gauge ..................................................
<br />86
<br />Day
<br />Pachometer...........................................................................................25
<br />day
<br />Particulate Monitor...............................................................................125
<br />day
<br />pH/Conductivity/Temperature meter ......................................................
<br />55
<br />day
<br />Photo -Ionization Detector(PID)...........................................................120
<br />day
<br />Pump, Typhoon 2 or 4 stage.........................................................1.......
<br />50
<br />day
<br />QED bladder pump w1QED control box...............................................160
<br />day
<br />Quire fee - Phase I only......................................................................
<br />200 each
<br />Resistivity field meter and pins..............................................................50
<br />day
<br />Slip I threaded cap, 2-inch or 4-inch diameter, PVC Schedule 40.........15
<br />each
<br />Slope inclinometer...-.. ........................................................................
<br />200
<br />day
<br />Soil sampling T-handle (Encore)...........................................................10
<br />day
<br />Soil sampling tripod ............... ........... .....................................................
<br />35
<br />day
<br />Speedy (R) moisture tester......................................................................
<br />5
<br />day
<br />Stainless steel bailer..............................................................................40
<br />day
<br />Submersible pump, 10 gpm, high powered Grundfos
<br />2-inch with controller.......................................................................160
<br />day
<br />Submersible pump/transfer pump, 10-25 gpm......................................
<br />50
<br />day
<br />Support service truck usage (well installation, etc.) .............................
<br />200
<br />day
<br />Survey/fence stakes................................................................................
<br />8 each
<br />Tedlar® bags.... ......... ............. .........................................................
<br />18 each
<br />Traffic cones (525)Ibarricades (single lane) ..........................................
<br />50
<br />day
<br />Turbiditymeter......................................................................................
<br />70
<br />day
<br />Tyvek® suit (each).................................................................................18
<br />each
<br />Vaporsampling box...............................................................................55
<br />day
<br />Vehicle usage (carrying equipment)......................................................
<br />20
<br />hour
<br />VelociCalc..............................................................................................35
<br />day
<br />Visqueen (20 x 100 feet).....................................................................100
<br />roll
<br />Water level indicator (electronic well sounder) <300 feet deep well....,.
<br />60
<br />day
<br />ZIPLEVEL©...........................................................................................15
<br />day
<br />Other specialized geotechnical and environmental testing and monitoring
<br />equipment are available, and priced per site
<br />0
<br />9 Fee/2022 www.leightongroup.com
<br />Page 3 of 4
<br />
|