My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 15 - Approve Agreements for Agreements for On-Call Engineering Services
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
08/16/2022 Regular
>
Item 15 - Approve Agreements for Agreements for On-Call Engineering Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2024 9:41:59 AM
Creation date
12/18/2024 8:22:07 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
15
Date
8/16/2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
599
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Jane Cataldo, RLA, Anaheim Convention Center - Anaheim, CA: Senior Project Manager, for <br />ENV SP, LEED AP the design -build team to coordinate on- and off -site landscape and hardscape <br />improvements for the Convention Center improvements. Project boundaries <br />(Continued) and the interface with existing facilities was a critical design item. The existing <br />plaza areas were redesigned to provide a seamless transition between the new <br />expansion and exhibit hall. The design incorporates all of the City of Anaheim <br />Resort District Master Plan criteria and the most recent Water conservation <br />ordinances, including the provision for future reclaimed water implementation. <br />Park to Playa Trail/Blair Hills Bridge - Los Angeles, CA: Senior Project <br />Manager for all management oversight for design and plan preparation for <br />this project. The bridge is a pedestrian and wildlife crossing connecting <br />Stoneview Nature Center to Kenneth Hahn State Recreation area. Key objectives <br />were the safe passage of pedestrians and indigenous wildlife over La Cienega <br />Boulevard, incorporation of sustainable practices for stormwater capture, and <br />conservation of natural resources. The scope of the project involved all phases of <br />plan preparation from schematic design through construction administration. <br />The project presented many challenges throughout the design that included <br />designing a crossing that would attract many wildlife species of all sizes and <br />requirements for safe passage, designing the crossing to satisfy numerous <br />agencies and stakeholders, and creating a structure that would aesthetically <br />integrate with the surrounding environment. <br />Peyton Drive Phase 3 and English Channel/Creek Habitat Mitigation <br />- Chino Hills, CA: Project Director for development and completion of <br />construction drawings and specifications for landscape and irrigation design. <br />She worked closely with the City of Chino Hills, project engineers and biologists <br />to execute all the documents outlined in the Compensatory Habitat and <br />Mitigation Monitoring Plan approved by the U.S. Army Corps of Engineers. <br />Some of the elements included the development of special native seed mixes <br />for various areas within several different mitigation zones along with planting <br />design for new channel keys downstream of the main project. Additionally, a <br />temporary irrigation system design was included in the scope and equipment <br />selection was consistent with all of the requirements of California AB 1881. <br />Well Site 54 - Anaheim, CA: As Project Manager, was responsible for working <br />with Boyle Engineers and City staff to landscape and irrigate all exposed <br />perimeters of this new pump station. Set in an existing, established residential <br />neighborhood, the facility required the landscape scheme be integrated into <br />the adjacent surroundings. The design for the project was completed using a <br />`California friendly' and native plant palette. <br />
The URL can be used to link to this page
Your browser does not support the video tag.