Laserfiche WebLink
Ar" LA I I <br />%31,4111 <br />2022-25 SCHEDULE OF CHARGES <br />PROFESSIONAL SERVICES <br />Document Preparation and Project Services <br />$ 105.00/hour <br />CAD/GIS Design Engineer <br />$ 120.00/hour <br />Staff Engineer or Geologist <br />$ 165.00/hour <br />Senior Staff Engineer or Geologist <br />$ 180.00/hour <br />Project Engineer or Geologist <br />$ 200.00/hour <br />Senior Engineer or Geologist <br />$ 235.00/hour <br />Associate Engineer or Geologist <br />$ 255.00/hour <br />Principal/Director <br />$ 280.00/hour <br />FIELD INSPECTION & TESTING SERVICES <br />Staff Engineering Technician $ 105.00/hour* <br />• Services provided under direct supervision of a Senior Engineering Technician <br />Senior Engineering Technician $ 122.00/hour* <br />• Inspections for soils/grading, asphalt, concrete, batch plants, piles/caissons, etc. <br />• Certifications by ACI, ICC, Caltrans, Iocal jurisdictions, etc. <br />Registered Special Inspector (No 9-hour minimum) $ 122.00/hour* <br />• Certifications by ACI, ICC, Caltrans, local jurisdictions, etc. <br />• Reinforced concrete, Post -Tension, Masonry, Welding, Bolting, Fireproofing <br />Instrumentation Engineer S 165.00/hour <br />• Slope inclinometer and Piezometer monitoring <br />• Manometer for floor -level surveys <br />• Stonnwater turbidity & pH meter <br />• Groundwater monitoring pressure transducer, datalogger, water chemistry meter, etc. <br />• Pipeline video camera for drains, wells, etc. <br />Engineering Seismological Technician (includes 3-channel seismograph) S 165.00/hour <br />• Blast vibration monitoring <br />• Construction vibration & noise monitoring (pile driving, drilling, demolition, etc.) <br />'Notes: <br />(1) Rates include vehicle, nuclear density gauge, and equipment for testing, inspection, and sampling. <br />(2) No 4-hour minimum charges apply. <br />(3) Overtime is charged at 1.5 times the base rate. Overtime is defined as time worked on the project <br />in excess of 8 hours per day and all time on Saturdays, Sundays, and holidays. <br />(4) Prevailing Wage projects, additional hourly surcharge for Field Personnel per <br />CA Labor Code § 1720, et seq. Add $ 29.00/hour <br />LABORATORY TESTING SERVICES <br />Laboratory Testing $ 130.00/hour <br />(For special materials testing and laboratory costs on a per -test basis, see GMU's Laboratory Fee Schedule) <br />OTHER CHARGES <br />Outside Services Cost + 15% <br />Reimbursables & Reprographics Cost <br />