My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 15 - Approve Agreements for Agreements for On-Call Engineering Services
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
08/16/2022 Regular
>
Item 15 - Approve Agreements for Agreements for On-Call Engineering Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2024 9:41:59 AM
Creation date
12/18/2024 8:22:07 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
15
Date
8/16/2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
599
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
_.aPPpppp� <br />1 <br />('st 1 <br />Ok 'S, II Proposal For <br />On -Call Water Resources Engineering Services <br />capacity. The result of this is that water velocity during pumping is much higher in the sections of <br />screen that produce the most water. During pumping, small sand particles mobilize and migrate <br />through the well filter pack and wedge into the pore space, reducing permeability in the filter pack. <br />Mitigation of this issue would include careful well development to remove the sand and resettle <br />the filter pack and modification of pumping operations to reduce sharp changes in water velocity <br />that mobilize fine-grained aquifer sand. Prior to redevelopment, it is recommended to review the <br />factors that can cause this reduction in specific capacity. The review would include assessment of <br />biological and cementation plugging and review the original, well construction documents including <br />the sieve analysis performed to size the filter pack and the daily construction (if available). As part of <br />developing a mitigation approach, spinner logs may be recommended to verify production zones. <br />Storm Drain Design and Drainage Analysis. The firm's drainage engineering services include the <br />design of canals, culvert crossings, water control structures, roads, levees, bridges, and pump station <br />structures as well as stormwater treatment services, such as bioretention, filters, rainwater capture <br />and reuse, and large flood control projects. Representative project areas range in size from one to <br />more than 130,000 acres, and our engineers have been called upon by numerous public agencies <br />and major agricultural, industrial, and residential developers. Our staff has the experience to conduct <br />preliminary studies and drainage consultation, prepare stormwater management plans, conduct <br />bridge scour analyses, prepare FEMA map revisions, perform floodplain analyses, and coordinate <br />permit applications on behalf of our clients. Kimley-Horn's engineering professionals are well -versed <br />in stormwater regulations throughout the state of California to help clients understand the permitting <br />process and guide them through difficult development decisions. <br />Sewer Design and Wastewater Services. Kimley-Horn is committed to providing clients with cost- <br />effective and state-of-the-art design solutions. We bring a unique understanding of water/wastewater <br />and recycled water system operations, end -user requirements, and design capabilities that enable <br />Kimley-Horn to produce plans that are constructible, meet the needs of our clients, and minimize <br />construction costs. We bring a complete understanding of water, wastewater, recycled, and reclaimed <br />water systems from the initial needs analysis and master planning to detailed design and construction <br />phase services. Kimley-Horn has extensive experience in design and construction of a wide variety of <br />projects, including planning and design of transmission and distribution pipelines; trenchless technology <br />designs; right-of-way and easement coordination; utility coordination; pipeline rehabilitation; water <br />treatment facilities design; tanks and booster pump station design; and permitting. Many of <br />Kimley-Horn's professionals are locally and nationally recognized in their respective fields. <br />Utility Design Coordination. Every project is unique and presents its own special design challenges; <br />however, the most frequent challenge we face in local municipal projects is related to existing utilities. <br />Most of the projects under this category are in developed areas where utility facilities are currently <br />within the proposed project area and any improvement will generally affect or be affected by the <br />location of the utility facilities. Kimley-Horn believes in drawing the utility lines and features to their <br />true size in our plans to aid in identifying conflicts early in the design phase; potholing potential conflict <br />locations when budgets allow, which gives a better understanding of the locations of the existing <br />utilities; and extensive coordination with the various utility companies. We also use three-dimensional <br />(3D) modeling of utilities to identify potential conflicts in the early stages of design. This method has <br />helped us to avoid discrepancies between construction documents and actual field conditions that have <br />resulted in cost-effective and timely execution of projects. <br />Our utility design team has successfully completed sewer and water infrastructure projects for various <br />agencies in Southern California. These projects consist of sewer and water main replacement, <br />City of Santa Ana ' IWOC77003.22 Kimley>Morn 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.