My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 15 - Approve Agreements for Agreements for On-Call Engineering Services
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
08/16/2022 Regular
>
Item 15 - Approve Agreements for Agreements for On-Call Engineering Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2024 9:41:59 AM
Creation date
12/18/2024 8:22:07 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
15
Date
8/16/2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
599
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Proposal For <br />On -Call Water Resources Engineering Services <br />1. On -Call Civil Engineering Design Consulting Services and Preparation of Temporary <br />Traffic Control Plans, Santa Monica, CA <br />Client: City of Santa Monica <br />Contact Information: Curtis Castle, Principal Civil Engineer, 310.458.8234 <br />2. Downtown Water and Sewer Phase 2 Replacement, Oceanside, CA <br />Client: City of Oceanside <br />Contact Information: Philip Tunnel, 760.435.5848 <br />3. Frisbie Park Sewer Lift Station and Ayala Zone 1A Booster Pump Station, Rialto, CA <br />Client: City of Rialto <br />Contact Information: Tom Crowley, Utilities Manager, 909.820.8056 <br />2. Scope of Services and Schedule <br />Scope of Services <br />The tasks below are intended to provide a sample of scope of services of a typical task order as part of <br />this on -call program. Actual tasks will vary based on each individual's project's needs and scope. <br />• Project Management and Coordination <br />• Record Research and Utility Coordination <br />• Geotechnical Investigation and <br />Pavement Evaluation <br />• Surveying and Mapping <br />• Hydraulic and Hydrology Analysis <br />• Water Quality management Report <br />• Environmental Studies <br />• Water Main Replacement Plans <br />• Well Rehabilitation Plans <br />• Street Improvement Plans <br />• Well System Modeling and Design <br />• Pump Station Building Design (Structural, <br />Architectural, MEP) <br />• Permitting and Agency Coordination <br />• Structural Analysis <br />• Strom Drain plans <br />• Landscaping and Irrigation Plans <br />• Signing and Striping Plans <br />• Traffic Signal and Traffic Handling Plans <br />• Specifications <br />• Opinion of Probable Construction Cost <br />• Potholing <br />• Bid and Construction Phase Support <br />Schedule <br />Per the City's Q&A, no schedule is required. For information regarding how we control our project <br />schedules, please refer to Section 1.d. <br />3. Fee Proposal <br />We have submitted our Fee Proposal as a separate file attachment, as instructed by the City's RFP. <br />4. Certifications <br />We have provided the forms listed below on the following pages: <br />• Attachment 3-1: Non -Collusion Affidavit <br />• Attachment 3-2: Non -Lobbying Certification <br />• Attachment 3-3: Non -Discrimination Certification <br />City of Santa Ana ' IWOC77003.22 <br />Kimley>Morn 20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.