My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 15 - Approve Agreements for Agreements for On-Call Engineering Services
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
08/16/2022 Regular
>
Item 15 - Approve Agreements for Agreements for On-Call Engineering Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2024 9:41:59 AM
Creation date
12/18/2024 8:22:07 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
15
Date
8/16/2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
599
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
JESUS "FREDDIE" OLMOS <br />Environmental - ECORP Consulting, Inc. <br />Mr. Olmos' 22 years of professional experience involves California Environmental <br />Quality Act (CEQA) and National Environmental Policy Act (NEPA) analysis and <br />document preparation for government agencies and private clients. He has prepared <br />and managed a variety of environmental documents, including Initial Studies/Mitigated <br />Negative Declarations (IS/MNDs), Environmental Impact Reports (EIRs), Environmental <br />Impact Statements (EISs), Environmental Assessments (EAs), and Findings of No <br />Significant Impact (FONSIs), including Addendum CEQA/NEPA documentation. While <br />his experience focuses on environmental report writing and permit preparation, he also <br />has experience with biological resources monitoring and surveying for public facilities <br />construction and research projects. Proficient in oral and written Spanish. Mr. Olmos <br />is experienced in the bilingual English -Spanish translation of notices, documents, and <br />handouts for CEQA and biological/cultural resources projects. <br />RELEVANT PROJECT EXPERIENCE <br />IS/MND for the Santiago Creek Recharge Project — Orange County Water District <br />Program EIR for the Sanitation Master Plan Update, Riverside and Imperial <br />Counties — Coachella Valley Water District as a subcontractor to CDM Smith <br />CEQA Documentation for Water Infrastructure Projects, San Bernardino and <br />Riverside Counties -- Yucaipa Valley Water District <br />On -Call Environmental Services — Costa Mesa, CA <br />CHRIS LOERA <br />Potholes - C-Below <br />Chris Loera has over 16 years of experience in the construction industry. He maintains <br />a hands-on approach by researching and attending industry workshops. He meets with <br />the equipment manufactures to stay up to speed on the new technologies available. <br />He plans, organizes, directs, and controls the activities of the Operations function of <br />the division. Responsible for the performance of all Departments including Research <br />and Development, Material Management, Order Services, Engineering and Surveying. <br />RELEVANT PROJECT EXPERIENCE <br />Mission Hospital Utility Mark Out - Mission Viejo, CA <br />Loera was Project Manager/Chief Operating Officer on this project. He supervised all <br />operations to ensure high quality control and accuracy when performing the utility mark <br />out. CBI performed utility locating in the parking lot and entrance driveway. Extensive <br />coordinating with the client and the site was required as well as flexibility on the schedule <br />and fulfilling all requirements for insurance and training. <br />IRWD Pump Station Potholing - Irvine, CA <br />Loera was Project Manager/Chief Operating Officer on this project. He supervised all <br />operations to ensure high quality control and accuracy when performing the utility mark <br />out. CBI performed utility locating in the parking lot and entrance driveway. <br />Well 32 Santa Ana Potholing 2018 -Santa Ana, CA <br />Loera was Project Manager/Chief Operating Officer on this project. He oversaw all operations from permitting <br />to on site traffic control set up. Supervised all operations to ensure high quality control and accuracy when <br />performing the potholing. Upon completion, the client was provided with a comprehensive pothole report. <br />HUIT MOLLARS <br />City of Santa On -Call Water Resources Engineering Services RFP No. 22-002 <br />
The URL can be used to link to this page
Your browser does not support the video tag.