My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 15 - Approve Agreements for Agreements for On-Call Engineering Services
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
08/16/2022 Regular
>
Item 15 - Approve Agreements for Agreements for On-Call Engineering Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2024 9:41:59 AM
Creation date
12/18/2024 8:22:07 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
15
Date
8/16/2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
599
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Huitt-Zollars prepared PS&E and right-of-way documents <br />to close an existing gap in Orange County's Master Plan <br />of Arterial Highways between Ortega Highway and the City <br />of San Clemente. This 3.7 mile long, $72 million project <br />was comprised of critical elements that came together for <br />the project's success: working within the Prima Deshecha <br />Landfill and designing controlled access to the landfill; <br />widening an existing section of roadway that must remain <br />in operation to serve the landfill and adjacent high school; <br />and pioneering a new roadway through undeveloped, <br />mountainous terrain with final roadway grades up to 7%. <br />Huitt-Zollars overcame multiple challenges associated <br />with the following critical elements: moving 15 million <br />cubic yards of earth; performing landslide remediation; mitigating effects of constructing the roadway through <br />a former landfill area and relocating more than one billion pounds (850K cubic yards) of municipal solid waste; <br />relocating two steel lattice electrical transmission towers; actively communicating with impacted communities; <br />and responding to numerous environmental mitigation measures that must be implemented during design and <br />construction. Challenges were also associated with constructing deep drainage culverts, storm drainage systems <br />and water quality basins, two cast in place bridge overcrossing and five 30-foot diameter steel multi -plate tunnel <br />undercrossings. Installed approximately 3,000 LF of sewer and domestic water line. <br />The project included Installation of approximately 3,000 LF of sewer and domestic water line and construction/ <br />extension of 22 cross culverts beneath the future roadway and a substantial roadway storm drain infrastructure <br />comprised of more than 15,000 linear feet of reinforced concrete pipe; ranging in size from 18 to 108 inches <br />in diameter. The roadway storm drain infrastructure segregates roadway runoff from offsite drainage areas <br />in order to facilitate treatment of roadway impervious surfaces. To meet Orange County criteria and NPDES <br />requirements, a total of six combined basins (to address water quality, hydromodification, and detention) were <br />included in the project to address pollutants of concern and meet LID requirements. Flood control requirements <br />are met by providing additional peak flow detention storage (over ten acre-feet) in these basins. <br />RELEVANT DESIGN <br />Value Engineering <br />COMPONENTS: <br />Landfill Engineering <br />• Sewer and Domestic Water <br />Pavement Rehabilitation & Overlay <br />• Road Widening <br />Geotechnical <br />• Gap Closure <br />Storm Drain <br />• Retaining Walls <br />Minor Structures <br />• Bridges and CSSP <br />Traffic Signals <br />• Design, Geometrics, PS&E <br />Traffic Control/Construction Staging <br />• Hydrology & Hydraulics <br />Signage & Striping <br />• Bridge Computer Programs <br />Construction Support <br />• Right -of -Way <br />Utility Coordination & Relocation <br />................................................ <br />Project of The Year Award <br />Design Quality Partner Award for Projects $51 - $100 Million . <br />#2 on Roads and Bridges Magazine Top 10 Roads List <br />B.E.S.T. Award for a Regional Transportation Project <br />............................................: <br />CLIENT CONTACT: <br />Nardy Khan - Deputy Director <br />County of Orange Public Works <br />300 N. Flower Street <br />Santa Ana, CA 92702 <br />714.920.7454 <br />nardy.khan@ocpw.ocgov.com <br />HUITL-ZOLLARS City of Santa On -Call Water Resources Engineering Services RFP No. 22-002 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.