5,000 cubic yards of materials per day are required to submit a Fugitive Dust Control Plan or a Large Operation <br />Notification Form to SCAQMD. Based on the size of the Project area (approximately 1.4 acres) a Fugitive Dust <br />Control Plan or Large Operation Notification would not be required. <br />SCAQMD's Rule 403 minimum requirements require that the application of the best available dust control <br />measures is used for all grading operations and include the application of water or other soil stabilizers in <br />sufficient quantity to prevent the generation of visible dust plumes. Compliance with Rule 403 would require <br />the use of water trucks during all phases where earth moving operations would occur. Compliance with Rule <br />403 has been included in the CalEEMod modeling for the proposed project. <br />Per SCAQMD Rule 1113 as amended on June 3, 2011, the architectural coatings that would be applied after <br />January 1, 2014 will be limited to an average of 50 grams per liter or less of VOCs for building coatings and <br />100 grams per liter or less of VOCs for traffic coatings. <br />The phases of the construction activities which have been analyzed below for each phase are: (1) demolition, <br />(2) grading, (3) building construction, (4) paving, and (5) application of architectural coatings. Details pertaining <br />to the project's construction timing and the type of equipment modeled for each construction phase are <br />available in the CalEEMod output in Appendix B. <br />Construction -Related Regional Impacts <br />The construction -related criteria pollutant emissions for each phase are shown below in Table 6. Table 6 <br />shows that none of the project's emissions will exceed regional thresholds. Therefore, a less than significant <br />regional air quality impact would occur from construction of the proposed project. <br />Construction -Related Local Impacts <br />Construction -related air emissions may have the potential to exceed the State and Federal air quality standards <br />in the project vicinity, even though these pollutant emissions may not be significant enough to create a <br />regional impact to the South Coast Air Basin. The proposed project has been analyzed for the potential local <br />air quality impacts created from: construction -related fugitive dust and diesel emissions; from toxic air <br />contaminants; and from construction -related odor impacts. <br />Local Air Quality Impacts from Construction <br />The SCAQMD has published a "Fact Sheet for Applying CalEEMod to Localized Significance Thresholds" <br />(South Coast Air Quality Management District 2011b). CalEEMod calculates construction emissions based on <br />the number of equipment hours and the maximum daily disturbance activity possible for each piece of <br />equipment. In order to compare CalEEMod reported emissions against the localized significance threshold <br />lookup tables, the CEQA document should contain the following parameters: <br />(1) The off -road equipment list (including type of equipment, horsepower, and hours of operation) assumed <br />for the day of construction activity with maximum emissions. <br />(2) The maximum number of acres disturbed on the peak day. <br />(3) Any emission control devices added onto off -road equipment. <br />(4) Specific dust suppression techniques used on the day of construction activity with maximum emissions. <br />The CalEEMod output in Appendix B show the equipment used for this analysis. <br />As shown in Table 7, the maximum number of acres disturbed in a day would be 2 acres during demolition <br />and grading. The local air quality emissions from construction were analyzed using the SCAQMD's Mass Rate <br />Localized Significant Threshold Look -up Tables and the methodology described in Localized Significance <br />Threshold Methodology prepared by SCAQMD (revised July 2008). The Look -up Tables were developed by <br />Cabrillo at First Mixed Use Residential <br />g3ldJ101 <br />Air Quality, Global Climate Change, HRA, and Energy Impact Analysis <br />29 19386 <br />