Laserfiche WebLink
CalEEMod Version: CalEEMod.2020.4.0 Page 1 of 27 Date: 11/10/2021 12:49 PM <br />19386 Cabrillo at First Mixed -Use Residential - Orange County, Summer <br />EMFAC Off -Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied <br />19386 Cabrillo at First Mixed -Use Residential <br />Orange County, Summer <br />1.0 Project Characteristics <br />1.1 Land Usage <br />Land Uses <br />Size <br />Metric <br />Lot Acreage <br />Floor Surface Area <br />Population <br />Apartments Low Rise <br />35.00 + <br />Dwelling Unit <br />; 0.73 73,500.00 <br />i 100 <br />_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ T <br />Other Non Surfaces 13.89 <br />_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _______________________________J---���--����---��-+_ <br />1000sgft 0.32 13,889.00 Ti 0 <br />-Asphalt <br />+ <br />; <br />______________________________------------------------------ �------------------------------ <br />--------------- }__________________F_______________ <br />Parking Lot <br />11.00 <br />Space <br />0.35 15,246.00 <br />0 <br />1.2 Other Project Characteristics <br />Urbanization Urban Wind Speed (m/s) 2.2 Precipitation Freq (Days) 30 <br />Climate Zone 8 Operational Year 2023 <br />Utility Company Southern California Edison <br />CO2Intensity 390.98 CH4Intensity 0.033 N20Intensity 0.004 <br />(lb/MWhr) (lb/MWhr) (lb/MWhr) <br />1.3 User Entered Comments & Non -Default Data <br />Project Characteristics - <br />Land Use - 1.4 ac w/ 35 MF DU (bldgs total --73,500 sf), 13,889 sf of open space, & parking lot w/ 11 open/guet parking spaces (77 total spaces, however 66 <br />are garages). Assumed —25% site (-0.35 acres) paving of parking & on -site driveways. <br />Construction Phase - Construction anticipated to begin 5/12/2022 & be completed by 8/16/2023. <br />Grading - Site anticipated to balance. <br />Demolition -—19,175 sf parking lot paving to be removed (19,175sfx0.3in=5,752.5cu ftx45lbs/cf2=258,862.5lbs= —129.4 tons). <br />Vehicle Trips - Per Project Trip Gen, 6.74 trips/DU/day weekday. ITE Trip Generation Manual 11th Edition utilized for Saturday (4.55 trips/DU/day) & Sunday <br />(3.86 trips/DU/day) trip gen rates. <br />Woodstoves - SCAQMD Rule 445 prohibits the installation of wood burning devices in new developments. <br />Sequestration - 72 new trees to be planted. <br />Construction Off -road Equipment Mitigation - <br />Apx-5 <br />