Laserfiche WebLink
CaIEEMod Version: CalEEMod.2020.4.0 Page 7 of 27 Date: 11/10/2021 12:49 PM <br />19386 Cabrillo at First Mixed -Use Residential - Orange County, Summer <br />EMFAC Off -Model Adjustment Factors for Gasoline Light Duty Vehicle to Account for the SAFE Vehicle Rule Applied <br />ROG <br />NOx <br />c0 <br />S02 <br />Fugitive <br />Exhaust <br />PM10 <br />Fugitive <br />Exhaust <br />PM2.5 <br />Bio- CO2 <br />NBio-0O2 <br />Total CO2 <br />CH4 <br />N20 <br />CO2e <br />PM10 <br />PM10 <br />Total <br />PM2.5 <br />PM2.5 <br />Total <br />Percent <br />6.66 <br />19.64 <br />27.61 <br />37.31 <br />48.02 <br />6.06 <br />46.18 <br />48.02 <br />5.69 <br />41.86 <br />0.00 <br />31.53 <br />31.53 <br />28.59 <br />30.85 <br />31.52 <br />Reduction <br />3.0 Construction Detail <br />Construction Phase <br />Phase <br />Number <br />Phase Name <br />Phase Type <br />Start Date <br />End Date <br />Num Days <br />Week <br />Num Days <br />Phase Description <br />1 • Demolition <br />'Demolition <br />i 5/12/2022 <br />1 6/17/2022 <br />5: <br />27 <br />i <br />I <br />i <br />i <br />2 •Grading <br />'Grading <br />16/18/2022 <br />:6/24/2022 <br />5: <br />5: <br />i <br />I <br />i <br />i <br />3 •Building Construction <br />'Building Construction <br />16/25/2022 <br />17/9/2023 <br />5: <br />270: <br />i <br />I <br />i <br />i <br />4 • Paving <br />'Paving <br />i 7/10/2023 <br />: 7/27/2023 <br />5: <br />14 <br />i <br />I <br />i <br />i <br />5 •Architectural Coating <br />:Architectural Coating <br />•7/28/2023 <br />•8/16/2023 <br />5. <br />14, <br />Acres of Grading (Site Preparation Phase): 0 <br />Acres of Grading (Grading Phase): 5 <br />Acres of Paving: 0.67 <br />Residential Indoor: 148,838; Residential Outdoor: 49,613; Non -Residential Indoor: 0; Non -Residential Outdoor: 0; Striped Parking Area: 1,748 <br />(Architectural Coating — sgft) <br />OffRoad Equipment <br />Phase Name I Offroad Equipment Type I Amount I Usage Hours I Horse Power I Load Factor <br />Architectural Coating 'Air Compressors <br />; 1 I <br />6.00 <br />78: <br />0.48 <br />---------------------------- <br />----------------------------------------- <br />Paving 'Cement and Mortar Mixers <br />; 1 I <br />6.001 <br />9 <br />0.56 <br />---------------------------- -------------------------- <br />---------------------------------- <br />----------------------------------------- <br />Demolition 'Concrete/Industrial Saws <br />; 1 I <br />8.00 <br />81 : <br />0.73 <br />---------------------------- -------------------------- <br />---------------------------------- <br />----------------------------------------- <br />Building Construction 'Cranes <br />; 1 I <br />6.001 <br />231, <br />0.29 <br />------------------------------------------------------ <br />-------------- <br />Building Construction 'Forklifts <br />; 1 I <br />6.001 <br />89, <br />0.20 <br />---------------------------- f--------------------------*----------------- <br />-------------------------- <br />------------- <br />Building Construction •Generator Sets <br />1 <br />8.00• <br />84• <br />0.74 <br />Apx-11 <br />