My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 19 - Cabrillo Crossing Density Bonus Agreement, 1814 & 1818 E. First Street
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2022
>
08/16/2022 Regular
>
Item 19 - Cabrillo Crossing Density Bonus Agreement, 1814 & 1818 E. First Street
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2024 9:50:53 AM
Creation date
12/18/2024 9:31:35 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
19
Date
8/16/2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
484
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Santa Ana <br />Mitigation Monitoring and Reporting Program <br />Mitigation Implementing <br />Measure No. Mitigation Measure Monitoring Party Party Mitigation Timing <br />o Installation of low -water -use appliances, <br />o Use of only natural gas or electric stoves, <br />o Installation of EnergyStar-labeled roof materials, <br />o Installation of highly reflective cool roofing materials, <br />o Installation of electrical outlets at exterior areas, <br />o Use of energy -efficient appliances (e.g., EnergyStar), <br />o Installation of shading mechanisms for windows, patios, <br />and walkways, and <br />o Installation of programmable thermostats. <br />Projects will "weatherize" any existing structures to achieve <br />energy savings. Weatherization strategies can include sealing <br />air ducts, insulating, glazing windows, and tuning up or <br />replacing air-conditioning and heating equipment. <br />MM-GHG-3 Where feasible, SCE -owned streetlights within the planning area Planning and Project During <br />will be purchased by the City, and the high-pressure sodium Building Agency/ applicant/ environmental <br />fixtures will be replaced with LED fixtures. Those streetlights Public Works Public Works review of future <br />within the planning area that are currently owned by the City will projects <br />also be replaced with LED fixtures. <br />MM-GHG-4 Where feasible and applicable, projects within the planning area <br />Planning and <br />Project <br />During project <br />will incorporate rain barrels and rainwater re -use practices into <br />Building Agency <br />applicant <br />design and <br />project design. <br />construction <br />MM-GHG-5 The following measures should be implemented to reduce water <br />Planning and <br />Project <br />During project <br />use and electricity associated with water -intensive plants: <br />Building Agency <br />applicant <br />design and <br />Drought -resistant native plants, as well as plants with low <br />construction <br />emissions and high carbon sequestration potential, should <br />substitute landscaping with turf grass and other water - <br />intensive vegetation. <br />Vegetable gardens, bunch grass, and low-water landscaping <br />should be encouraged for development within the planning <br />area. <br />MM-GHG-6 The following measures would be implemented by future Planning and Project During <br />development projects in the MEMU Overlay Zone to the extent Building Agency applicant environmental <br />practicable to improve pedestrian safety and encourage walking to review of future <br />and from the project area: projects <br />Metro East Mixed -Use Overlay District Expansion and Elan Development Projects 12 <br />August 2018 <br />ICF00019.18 <br />Apx-236 <br />
The URL can be used to link to this page
Your browser does not support the video tag.