My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 20 - Award a Construction Contract to Aguilar & Calderon for Sidewalk Replacement Project
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
01/21/2025
>
Item 20 - Award a Construction Contract to Aguilar & Calderon for Sidewalk Replacement Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2025 4:50:56 PM
Creation date
1/16/2025 8:37:40 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
20
Date
1/21/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT 6 <br />PROJECT TITLE: <br />Sidewalk Replacement FY 24125 <br />PROJECT CATEGORY: <br />Street Improvements <br />Curb, Gutter, Sidewalk <br />Improvements <br />LOCATION MAP A <br />N <br />AGENCY: <br />Public Works <br />CITY OF SANTA ANA FY 24/25CIP <br />CAPITAL IMPROVEMENT PROJECT WORKSHEET <br />PROJECT DESCRIPTION: <br />This project will provide for replacement of damaged and <br />deteriorated concrete sidewalk, curbs, gutters, wheelchair ramps, <br />and driveway approaches. This project focuses on areas with the <br />highest concentration of needed repairs, to help mitigate trip <br />hazards and reducing potential claims and assist in complying with <br />regulations by the American Disabilities Act. <br />PROJECT COSTS FY 24/25 FY 25/26 FY 26/27 FY 27128 FY 28/29 FY 29/30 FY 30131 <br />Construction 840,942 - - - - - - <br />Contingency 73,126 - <br />Engineering 85,932 - <br />TOTAL 1,000,000 - - - <br />SOURCE OF FUNDS FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28129 FY 29/30 FY 30131 <br />GENERAL FUND 1,000,000 - - - - - - <br />DIVISION: <br />CIP Engineering <br />TOTAL 1,000,000 - - - - <br />CONTACT: <br />Gilbert Castillo, Senior Engineer <br />DATE: <br />06-Jan-2025 <br />
The URL can be used to link to this page
Your browser does not support the video tag.